USPTO serial 87205157
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Timothy J. Lyden
TIMOTHY J. LYDEN HOGAN LOVELLS US LLP8350 Broad Street, 17th FloorATTN: BOX INTELLECTUAL PROPERTYTysons, VA 22102| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines for generating and converting energy and installations constructed therefrom, namely, wind power plant machines in the nature of individual wind-powered electricity generating machines, wind turbines, wind-powered machines in the nature of wind-powered electricity generators and machines for energy generation in the nature of wind-powered electricity generators; component parts for the aforesaid wind power plant machines, in particular rotor blades, rotors, rotor consoles, towers, masts, blade hubs, machine housings, machine foundations, rotor adjusters, devices for setting the pitch of the blades in the nature of servo motors, brakes and brake equipment in the nature of hydraulic brakes, brake lining and block brakes, main drive shafts, universal joints, transmission gears, gear boxes, couplings and electric generators | ACTIVE | — |
| 009 | Switch cabinets in the nature of electric switch housing containing switches for controlling actuator systems for wind power plants and wind farms; regulating apparatus for wind power plants, namely, wind turbines controllers; electric, electronic and computer equipment in the nature of computer hardware for wind power plants, namely, computers, inverter tans sensors for installation in wind turbine housings; control and monitoring apparatus, namely, power controllers, current controllers, torque controllers, speed controllers, condition monitoring systems, access controllers and alarm monitoring systems; electric and electronic instruments and apparatus, namely, electric accumulators, network interfaces, signal processor; computer software for data acquisition of wind turbines, data management of wind power plants, control of wind turbines, data transmission with wind turbines; data processing equipment and computers; computer network interface apparatus and computers programs for monitoring and regulating wind power plants and wind farms | ACTIVE | — |
| 037 | Installation, maintenance, overhauling, servicing and repair of wind power plants | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 16, 2020 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Mar 16, 2020 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Aug 9, 2019 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 7, 2019 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Aug 7, 2019 | EXT4 | SOU EXTENSION 4 FILED | — |
| Aug 7, 2019 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 29, 2019 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 28, 2019 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Jan 25, 2019 | EXT3 | SOU EXTENSION 3 FILED | — |
| Jan 25, 2019 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 17, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 16, 2018 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Aug 16, 2018 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Aug 7, 2018 | EXT2 | SOU EXTENSION 2 FILED | — |
| Aug 7, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 7, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 5, 2018 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Feb 5, 2018 | EXT1 | SOU EXTENSION 1 FILED | — |
| Feb 5, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 8, 2017 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 13, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 13, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 24, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 6, 2017 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 27, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 27, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 27, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 27, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 27, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 26, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 26, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 26, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 26, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 1, 2016 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Oct 31, 2016 | ALIE | ASSIGNED TO LIE | — |
| Oct 21, 2016 | MPMK | NOTICE OF PSEUDO MARK E-MAILED | — |
| Oct 20, 2016 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Oct 20, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 20, 2016 | NWAP | NEW APPLICATION ENTERED | — |