USPTO serial 87219479
GEOKON
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 26, 2017
- Examiner
- HUDSON, TAMARA BREE
- Law office
- Historical data usage
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with GEOKON?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $399*
Plus Government fees of $650
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Gordon E.R. Troy, Esq.
Gordon E.R. Troy, Esq. Gordon E.R. Troy, PCPO Box 67Windsor, VT 05089United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Accelerometers; Monitoring devices in the nature of civil structural instrumentation for monitoring stability, strength and rigidity of braced excavations, bridges, concrete dams, culverts, earth dams, embankments, foundations, ground water remediation schemes, landfills, mine openings, nuclear waste repositories, piles, pipelines, retaining walls, shafts, slopes, slurry wall excavations, subway systems, tiebacks, tunnels, underground powerhouses, and wind turbines; Computer software for use with analog and digital electronic measuring devices, data acquisition transceivers and wireless sensor networks, namely, software for measuring data in the nature of displacements, elongations, force, movement, orientation, pressure, strain, temperature, gathered from accelerometers, displacement sensors, displacement transducers, gauges, inclinometers, multiplexers, transducers and triaxial accelerometers, used individually and in combination with each other; Measuring devices, namely, crackmeters for measuring movement across surface cracks and joints; Electronic data loggers; Displacement sensors for measuring distance, movement, dimension; Electrical displacement transducers for use in measuring linear position; Proximity sensors in the nature of distance sensors; Downloadable computer software for remote monitoring and analysis of acceleration, displacements, force, load, movement, orientation, pressure, strain, temperature, tilt and vibration; Electric or electronic sensors for measuring acceleration, displacements, force, load, movement, orientation, pressure, strain, temperature, tilt and vibration; Electrical control, testing and monitoring apparatus for use in controlling, testing, and monitoring acceleration, displacements, force, load, movement, orientation, pressure, strain, temperature, tilt and vibration; Electronic load modules consisting of vibrating wire and electrical resistance load cells for use in monitoring loads in tie-backs and rock bolts in excavation walls, long-term loads in concrete dams, loads in steel arch tunnel supports and cross lot struts and loads during pile testing; Testing devices, namely, extensometers for measuring axial displacements at a point or at points along a borehole in rock, soil or concrete; Fiber optics; Geotechnical and structural instrumentation in the nature of accelerometers, displacement sensors, displacement transducers, pressure gauges, inclinometers, multiplexers, transducers and triaxial accelerometers for monitoring the safety and stability of structures, including braced excavations, bridges, concrete dams, culverts, earth dams, embankments, foundations, ground water remediation schemes, landfills, mine openings, nuclear waste repositories, piles, pipelines, retaining walls, shafts, slopes, slurry wall excavations, subway systems, tiebacks, tunnels, underground powerhouses, and wind turbines; Geotechnical instrumentation in the nature of accelerometers, displacement sensors, displacement transducers, pressure gauges, inclinometers, multiplexers, transducers and triaxial accelerometers for monitoring earth materials, namely, minerals, rocks, soil and water; Inclinometers; Joint meters for use in monitoring movement of joints in structures; Length measuring gauges; Level sensors, namely, liquid level sensors, settlement level sensors to measure settlement of dams, fills and embankments, foundations, roadways, storage tanks and surcharges; Liquid level sensors; Transducers in the nature of load cells for converting force into electrical output; Microcontrollers; Micro-electro mechanical systems for use in monitoring stability, strength and rigidity of civil structures; Electric monitoring apparatus, namely, analog and digital electronic measuring devices, and data acquisition transceivers for measuring data in the nature of displacements, elongations, force, movement, orientation, pressure, strain, temperature, gathered from accelerometers, displacement sensors, displacement transducers, gauges, inclinometers, multiplexers, transducers and triaxial accelerometers; Multiplexers; Orientation sensors; Piezometers; Potentiometers; Pressure cells for use in measuring total pressure in earth dams, concrete dams, tunnels, mine openings, foundations, piles, embankments, retaining walls, slopes, subway systems, underground powerhouses, bridges, culverts, pipelines, shafts, slurry wall excavations, braced excavations, tiebacks, nuclear waste repositories, ground water remediation schemes, wind turbines, and landfills; Pressure gauges; Pressure indicators; Pressure measuring apparatus; Pressure recording apparatus; Pressure sensors; Proximity sensors; Remote temperature sensors; Sensors, other than for medical use, namely, accelerometers, displacement sensors, displacement transducers, pressure gauges, inclinometers, multiplexers, transducers and triaxial accelerometers; Sensors for determining temperature; Settlement sensors to measure settlement of dams, fills and embankments, foundations, roadways, storage tanks and surcharges; Strain gauges; Stressmeters for measuring stability, strength and rigidity of civil structures; Temperature gauges; Temperature indicators; Temperature sensors; Thermistors; Tiltmeters; Electrical transducers; Triaxial accelerometers; Vibrating wire sensors; Vibration meters; Vibration sensors; Water meters; Wired and wireless controllers to remotely monitor and control the function and status of other electrical, electronic, and mechanical devices or systems, namely, analog and digital electronic measuring devices and data acquisition transceivers for monitoring stability, strength and rigidity of braced excavations, bridges, concrete dams, culverts, earth dams, embankments, foundations, ground water remediation schemes, landfills, mine openings, nuclear waste repositories, piles, pipelines, retaining walls, shafts, slopes, slurry wall excavations, subway systems, tiebacks, tunnels, underground powerhouses, and wind turbines | ACTIVE | Jul 1, 1979 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 3, 2024 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jul 3, 2024 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jul 3, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Dec 20, 2023 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Sep 27, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 27, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 27, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 26, 2022 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jan 10, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 10, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 10, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 26, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 10, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 10, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 20, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 25, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 4, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 4, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 4, 2017 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jul 26, 2017 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jul 26, 2017 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 26, 2017 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 30, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 30, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 30, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 10, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 10, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 10, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 6, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 2, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 1, 2016 | NWAP | NEW APPLICATION ENTERED | — |