USPTO serial 87221604
ZEDBOX
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Mar 6, 2018
- Examiner
- ROSEN, AMANDA
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with ZEDBOX?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Suffolk IP31 3RN, GB
Suffolk IP31 3RN, GB
Suffolk IP31 3RN, GB
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Lori S. Kozak
LORI S. KOZAK FOX ROTHSCHILD LLP997 LENOX DRIVE, BUILDING 3LAWRENCEVILLE, NJ 08648-2311UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Building materials, namely, metal reinforcing materials; transportable buildings of metal; prefabricated buildings of metal; building elements of metal, namely, metal pillars for buildings, metal building panels, metal building boards; relocatable buildings of metal; transportable metallic buildings; prefabricated metal buildings; metallic frames for buildings; modular prefabricated steel framing for building; metal gates; doors of metal; safes; metal rails and tracks for sliding doors or for sliding panels; metal stairs and rails | SECTION 8 - CANCELLED | — |
| 019 | Non-metallic transportable buildings; non-metallic prefabricated buildings; non-metallic modular buildings; transportable buildings of timber; prefabricated buildings of timber; modular buildings of timber; non-metallic buildings, namely, transportable residential accommodation units; non-metallic buildings, namely, prefabricated residential accommodation units; non-metallic modular buildings, namely, residential accommodation units; non-metal doors; non-metal gates; tile floorings, not of metal; plywood, chipboard, plasterboard | SECTION 8 - CANCELLED | — |
| 020 | Furniture; office furniture; worktops and table tops; doors for furniture; drawer units for furniture; beds, wardrobes, dressing tables; vanity units, namely, bathroom vanities; mirrors, picture frames; curtain rods; curtain poles and fittings for use with curtains; blinds of reed, rattan and bamboo for doors or windows | SECTION 8 - CANCELLED | — |
| 035 | Administration of the business affairs of retail stores; retail store services featuring prefabricated buildings, transportable buildings, modular buildings, bespoke manufactured buildings, transportable residential accommodation units, prefabricated residential accommodation units and modular residential accommodation units; wholesale store services featuring prefabricated buildings, transportable buildings, modular buildings, bespoke manufactured buildings, transportable residential accommodation units, prefabricated residential accommodation units and modular residential accommodation units | SECTION 8 - CANCELLED | — |
| 037 | Building services, namely building construction services; carpentry services; building construction and repair; building construction services, namely, construction of component parts of buildings in the nature of interlocking socketed chassis and frameworks for buildings, construction of prefabricated buildings, construction of garden office buildings, construction of office buildings, construction of studios, and summer houses and residential accommodation units; supervision of building construction and repair; supervision of building work in the nature of building construction; custom construction of buildings; residential and commercial building construction; on site project management relating to the construction of buildings; general building contractor services; construction services, namely, erection of prefabricated buildings; construction services, namely, assembly of prefabricated houses; construction services, namely, construction of prefabricated houses; construction services, namely, assembly in the nature of installation of building framework; building inspection in the course of building construction; drilling of wells; maintenance and repair of buildings, parts and fittings for buildings and utilities of buildings; property development, namely property construction; wiring of buildings for telecommunication transmission; building damp-proofing; application of protective coatings to building exteriors; application of protective coatings to building surfaces; application of protective paint to buildings; sealing of buildings during construction; building sealing; interior and exterior cleaning of buildings; specialist building restoration; refurbishment of buildings; repair and maintenance of building scaffolds, working and building platforms; building demolition, namely, dismantling of buildings; demolition of buildings; installation of electric appliances, alarms, burglar alarms, fire alarms, fire detection systems, safes and security systems; installation of bedrooms, kitchens, kitchen equipment, bathrooms and bathroom equipment; installation of access control systems; installation of flood warning systems; installation, changing, replacement and repair of locks; installation of apparatus for heating, lighting, air conditioning, central heating; installation of electronic and computerized systems for monitoring energy efficiency and usage; installation of environmental engineering systems; installation of pipework systems, sewers, drains, pipes and washroom apparatus; installation of lifts and elevators; computer hardware and telecommunication apparatus installation, maintenance and repair; computer installation services; preparation of a site for the installation of computer equipment; building construction services, namely, building fabrication and finishing services | SECTION 8 - CANCELLED | — |
| 040 | Custom manufacture and assembly of furniture for others; custom manufacture and assembly of building frameworks and chassis for others; custom manufacture and assembly of prefabricated building components for others; custom manufacture and assembly of buildings, prefabricated buildings, garden office buildings, office buildings, studio buildings, summer houses, and buildings in the nature of residential accommodation units; damp-proofing services for existing buildings; treatment of materials found on buildings, namely, wood for the purpose of rot prevention; fire-proofing to existing buildings; custom manufacturing of cabinets; custom manufacture of furniture; custom manufacturing of joinery | SECTION 8 - CANCELLED | — |
| 042 | Architecture services; architecture design services; computer aided design services related to architecture; drafting of construction plans for recreational premises; urban planning; engineering; interior design; surveying; land surveying; building surveying; road surveying; surveying of defective structures; quantity surveying; home inspection; inspection of buildings for the existence of mold; engineering surveying; quality control of completed buildings; environmental testing; computer aided design for manufacturing operations; computer aided part and mold design services; computer assisted engineering design services; computer-aided engineering design and drawing services; computer aided graphic design; industrial design | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Zedbox Limited
- Other trademarks owned by Zedbox Limited
- Other trademarks owned by Zedbox Limited
- Other trademarks in Class 006
- Other trademarks in Class 019
- Other trademarks in Class 020
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named ZEDBOX
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 20, 2024 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Mar 6, 2023 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Mar 6, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 22, 2017 | 1.BD | Sec. 1(B) CLAIM DELETED | — |
| Dec 22, 2017 | ISPO | WITHDRAWN FROM ISSUE - PETITIONS OFFICE REQUEST | — |
| Dec 20, 2017 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| Dec 19, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 19, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 29, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 15, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 11, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 10, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 10, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 20, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 20, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 20, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 30, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 30, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 28, 2017 | ALIE | ASSIGNED TO LIE | — |
| Aug 8, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 16, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 16, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 16, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 7, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 3, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 3, 2016 | NWAP | NEW APPLICATION ENTERED | — |