Drawing for RK&K

USPTO serial 87259249

RK&K

Reviewed by CopyMark Law Group

Reg. 5279874Status 702Renewal
Filing date
Status date
Registration date
Sep 5, 2017
Examiner
FRIEDMAN, LESLEE ANN
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with RK&K?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,446*

Plus Government fees of $2,600

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
035project management services for others for business purposes in the fields of engineering, architecture, infrastructure design and urban planning design; business project management services, namely, contract administration; value engineering, namely, cost analysis; cost price analysis in the nature of construction cost estimating; energy usage management services and consulting services in the field of energy usage management and energy efficiency; public advocacy to promote awareness of environmental regulatory matters; construction planning in the nature of construction cost estimatingACTIVE—
037construction management services; construction project management services; inspection services in the course of construction of buildings, facilities, public infrastructures, transportation infrastructures, utility infrastructures, highways, bridges, tunnels, airports, transit systems, public utility systems, water treatment and distribution systems and waste treatment plants; construction planning and scheduling; construction planning and laying out of residential and commercial communities, commercial buildings, facilities and associated utilities and infrastructure; land development and redevelopment services, namely, planning and laying out of buildings, facilities, public infrastructures, transportation infrastructures, utility infrastructures, highways, bridges, tunnels, airports, transit systems, public utility systems, water treatment and distribution systems and waste treatment plants; consulting services for the identification, evaluation, repair, restoration, protection and preservation of historic or significant buildings, structures and properties; consultation services in the field of construction of environmentally-conscious facilities and infrastructure; construction supervision; construction consultation; construction management, construction project management and maintenance services in the fields of infrastructure for transportation, transit, and railway, building and municipal infrastructure; construction project oversight and support services in the nature of providing building, facility and infrastructure construction information; construction planning services, namely, construction scheduling, construction phase planning, conducting construction feasibility studies, conducting constructability reviews and construction design reviews; construction consulting in the field of contract claims analysis; consulting on construction in the field of natural gas utilities, natural gas pipelines and distribution systems and petroleum pipelines, storage and distribution systemsACTIVE—
042technology consultation in the fields of engineering and construction contract administration; consulting services in the field of energy usage design in the nature of engineering of buildings, facilities and infrastructures for energy and resource conservation and efficiency; railway, transit and transportation infrastructure technical services in the nature of evaluation and planning of infrastructure systems; utility infrastructure technical services in the nature of evaluation and planning of infrastructure systems; engineering services; urban planning and design; streetscape planning and design; site planning and design in the field of buildings, facilities, public infrastructures, transportation infrastructures, utility infrastructures, highways, bridges, tunnels, airports, transit systems, public utility systems, water treatment and distribution systems and waste treatment plants; airport facilities planning and design services; parks and recreational facilities planning and design; green infrastructure planning and design; landscape planning and design; landscape architecture; land use planning services; transit planning and engineering design services; urban design planning services; transportation and traffic planning and engineering design services; engineering services, namely, geotechnical engineering; research on building construction or city planning; planning and design for others of buildings, facilities, public infrastructures, transportation infrastructures, utilities, highways, bridges, tunnels, airports, transit systems, public utility systems, water treatment and distribution systems and waste disposal systems; conducting engineering surveys; mechanical engineering; civil engineering; construction engineering; geo-environmental engineering; corrosion engineering; utility engineering; engineering design services; traffic and transportation engineering; water resources and natural resources investigations and engineering; toll planning and engineering services; transit and rail engineering; consulting, design, testing and inspection services in the field of structural engineering for buildings, facilities, public infrastructures, transportation infrastructures, utility infrastructures, highways, bridges, tunnels, airports, transit systems, public utility systems, water treatment and distribution systems and waste treatment plants; conducting feasibility studies and surveys in the field of civil engineering, environmental engineering, transportation, transit and railway infrastructures; engineering services in the field of environmental compliance; drafting of plans and engineering drawings for others; environmental services, namely, technical consultation in the field of environmental science; engineering services and design for others in the field of environmental engineering; engineering services for building and property condition assessment, facility management, repair and restoration and building instrumentation; consulting services in the field of sustainable building design; engineering services for the restoration, upgrade, rehabilitation and construction of water treatment and purification plants, water distribution systems, flood control studies and design, solid and hazardous waste treatment plants, waste-water treatment plants, waste-water systems, and other infrastructure facilities; civil engineering relating to water irrigation; information technology consulting services; computer aided design services; geospatial analysis consulting services; cultural resources and archeological investigation, exploration, research, planning and consultation; environmental engineering, testing and inspection services; consulting services in the field of environmental assessment, planning and restoration; drafting of construction plans for others; professional consulting services in the fields of engineering, land use planning, surveying, landscape architecture and environmental sciences; material testing; engineering, namely, building systems analysis; investigating, identifying, locating, surveying and providing relocation design for existing and proposed utilities; consulting on engineering and engineering services in the field of natural gas utilities, natural gas pipelines and distribution systems and petroleum pipelines, storage and distribution systems; surveying; conducting land, utility, topographic and hydrographic surveying, mapping and document preparation services in relation to mapping; energy auditing; consulting in the field of geographic information systems; environmental engineering services, namely, investigation and design and development of corrective action, prevention, remediation and response plans; computer programming; CADD and GIS applications and database programming; website design and development; and consulting services in the design, selection and implementation of computer hardware and software for others; conducting archaeological investigations and reviews; auditing services, namely, technical analysis and evaluation in the field of transportation, transit and railway infrastructureACTIVE—
045reviewing environmental data, analyzing the data in connection with environmental laws and regulations and preparing environmental compliance reports; advice and consultancy on environmental regulatory matters; permitting, namely, obtaining environmental, design, zoning and other governmental permits for development projects; reviewing standards and practices to assure compliance with environmental laws and regulations; regulatory compliance consulting and inspection; conducting archaeological permit submittalsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 5, 2026REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Sep 5, 2026REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Sep 5, 2026REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Sep 5, 2026REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Apr 18, 2025WOAGWITHDRAWAL OF ATTORNEY GRANTED—
Apr 18, 2025WOARTEAS WITHDRAWAL OF ATTORNEY RECEIVED—
Jul 18, 2024NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jul 18, 2024C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jul 18, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 5, 2024E815TEAS SECTION 8 & 15 RECEIVED—
Sep 5, 2022REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Sep 5, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 20, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 20, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 31, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 5, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 5, 2017XAECEXAMINER'S AMENDMENT ENTERED—
May 5, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 5, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
May 5, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
May 4, 2017ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Apr 25, 2017PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Mar 21, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 18, 2017XAECEXAMINER'S AMENDMENT ENTERED—
Mar 18, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 18, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 18, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 13, 2017GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 13, 2017GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 13, 2017CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 8, 2017DOCKASSIGNED TO EXAMINER—
Dec 13, 2016MPMKNOTICE OF PSEUDO MARK E-MAILED—
Dec 10, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 9, 2016NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance