USPTO serial 87259524
TRANSACTIVEGRID
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 19, 2017
- Examiner
- MAYES, LAURIE ANN
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with TRANSACTIVEGRID?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John P. McCormick
John P. McCormick Fish & Richardson P.C.P.O. Box 1022Minneapolis, MN 55440-1022UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Automated process control system, namely, micro-processor based hardware and software used to monitor the status of industrial processes, namely, power generation, electrical distribution and oil and gas processing; Automated process control system, namely, micro-processor based hardware and software used to monitor the status of industrial machinery, namely, turbines, generators and compressors; Climate control systems consisting of digital thermostats, air conditioning, heating, ventilation and drying control devices; Computer programs and computer software for electronically trading securities; Computer programs for the enabling of access or entrance control; Computer software, namely, electronic financial platform that accommodates multiple types of payment and debt transactions in an integrated mobile phone, PDA, and web based environment; Computer programs and computer software for electronically trading securities; Electric control devices for heating and energy management; Electric control panels; Electrical controllers; Electrical controlling devices; Electrical energy utilization metering devices complete with related software; Electrical integrated control systems for use in the field of energy and electricity; Electricity router for managing and optimizing energy loads within a building; Electronic control systems for machines; Electronic control systems for machines; Electronic controllers for use with power converters; Electronic devices, namely, energy meters for tracking and monitoring energy usage; Electronic devices, namely, energy submeters for tracking and monitoring energy usage; Electronic regulating and control devices for the operation of light emitting diodes; Facilities management software, namely, software to control building environment, access and security systems; Gateway routers in the nature of computer control hardware; Industrial process control software; LED and HID light controls; Lighting control apparatus; Lighting control panels; Lighting control apparatus; Lighting control panels; Lighting controls; Lighting panel control boards; Remote circuit breaker control switch operators; Remote control telemetering machines and apparatus; Security alarm controllers; Software for monitoring and controlling communication between computers and automated machine systems; Water heater controls; Wind turbine controller; Wireless controllers to remotely monitor and control the function and status of other electrical, electronic, and mechanical devices or systems, namely, Internet of Things devices; Apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; Apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; Automated process control system, namely, micro-processor based hardware and software used to monitor the status of industrial processes, namely, power generation, electrical distribution and oil and gas processing; Automated process control system, namely, micro-processor based hardware and software used to monitor the status of industrial machinery, namely, turbines, generators and compressors; Automated process control system, namely, micro-processor based hardware and software used to monitor the status of industrial processes, namely, power generation, electrical distribution and oil and gas processing; Electrical controllers; Electronic regulating and control devices for the operation of light emitting diodes; LED and HID light controls | SECTION 8 - CANCELLED | Sep 20, 2015 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 5, 2024 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Dec 19, 2022 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Dec 19, 2017 | R.SR | REGISTERED-SUPPLEMENTAL REGISTER | Your mark is registered on the Supplemental Register, which is available for marks that are not yet distinctive enough for the Principal Register but can still identify a source. Protection is more limited than Principal Register registration but can later support a Principal Register application. |
| Nov 14, 2017 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 10, 2017 | CNTA | APPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER | — |
| Nov 9, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 9, 2017 | ALIE | ASSIGNED TO LIE | — |
| Nov 9, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 9, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 9, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 2, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 15, 2017 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Sep 15, 2017 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 15, 2017 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 8, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 8, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 8, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 8, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 8, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 8, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 8, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 13, 2016 | MPMK | NOTICE OF PSEUDO MARK E-MAILED | — |
| Dec 10, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 9, 2016 | NWAP | NEW APPLICATION ENTERED | — |