USPTO serial 87261875
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $3,250
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Felicia J. Boyd
Felicia J. Boyd Norton Rose Fulbright US LLP98 San Jacinto Blvd., Suite 1100Austin, TX 78701UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 035 | Business consultation and advisory services in the fields of capital infrastructure, project planning, value engineering, costs details, risk management, and schedule analysis | ACTIVE | — |
| 037 | Asbestos removal; Building demolition; Construction and construction management of tunnels and underground structures; Construction and renovation of buildings; Construction and repair of buildings; Construction dewatering, namely, the removal of surface waters and groundwater to facilitate the construction of structures and pipelines; Construction management; Construction of airports; Construction of slurry wall and concrete structures, namely, bridges, abutments, and drainage; Consulting services in the field of construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Custom construction and building renovation; Excavation services; Foundation contractor services; Hazardous waste disposal services; House and building demolition; Installation of vehicular and pedestrian bridges; Installation of slurry wall; Installation, maintenance and repair of bridges and tunnels; Maintenance and repair of bridges and tunnels; Marine construction; Paving contractor services; Pier construction; Repair and maintenance of buildings in case of demolition; Repair or maintenance of nuclear power plants; Repair or maintenance of water pollution control equipment; Residential and commercial building construction; Road construction; Road paving; Scaffolding, earthworks or concrete construction; Snow removal services; Soil erosion control services; Solid waste landfill services; Steel structure construction works; Street construction; Technical support services, namely, technical advice related to the installation of bridges and tunnels; Underwater dredging; Waste disposal for others; Oil, gas, and water pipeline construction, installation, laying, repair, rehabilitation, and maintenance services; construction, installation, repair, rehabilitation and maintenance services of compressor stations, pump stations, metering and regulator stations, processing plants, fuel tank farms, fueling facilities, port and wharf loading and unloading facilities, rail facilities, and refineries; construction, installation, repair, rehabilitation and maintenance services of pads, namely, structures for housing and supporting equipment and machinery, fuel and oil tanks, pumps, gathering and processing lines, mud pits, fresh water frac ponds; construction of storm water control infrastructure and site reclamation services; construction, installation, repair, rehabilitation and maintenance services of solar arrays for carports, ground-mounted, or rooftops; construction, installation, repair, rehabilitation and maintenance services of wind turbines | ACTIVE | — |
| 040 | Custom building of manholes, intakes, outfalls and perimeter security enhancement, namely, bollards, fences, guard booths, and security gates; Custom construction of manholes, intakes, outfalls and perimeter security enhancement, namely, bollards, fences, guard booths, and security gates; Decontamination of hazardous materials; Decontamination of nuclear waste; Demolition services, not buildings; Detoxification of hazardous materials; Environmental remediation services, namely, treatment of soil, waste and water; Hazardous waste management; Incineration of waste; Industrial toxic waste disposal; Nuclear waste treatment; Sorting of waste and recyclable material; Treatment of waste water; Waste incineration; Waste management; Waste treatment; Waste treatment services; Waste water reprocessing; Waste water treatment services; Water treatment services | ACTIVE | — |
| 042 | Project development and engineering services in the fields of solar energy, pipelines, marine ports, waste management, power plants, civil infrastructure, and civil construction | ACTIVE | — |
| 045 | Consultation services concerning homeland safety and security issues; Consulting services in the field of homeland security; Consulting services in the field of maintaining the security and integrity of databases; Consulting services in the field of national security; Control of building environmental access and security systems; Providing consultation and information in the field of emergency response for communities; Providing information concerning homeland safety and security issues; Security consultancy; Security services, namely, providing security assessments for businesses and governmental agencies; Security services, namely, providing security assessments of physical locations, information systems, and working environments; Security services, namely, water vulnerability assessment services; Security threat analysis for protecting public safety | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 17, 2024 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Apr 17, 2024 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Apr 17, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 18, 2023 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Oct 31, 2022 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Nov 21, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 21, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 28, 2017 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 28, 2017 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 31, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 15, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 15, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 26, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 11, 2017 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 8, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 15, 2017 | DMCC | DATA MODIFICATION COMPLETED | — |
| Jun 15, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 15, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 15, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 15, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 25, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 25, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 24, 2017 | ALIE | ASSIGNED TO LIE | — |
| May 1, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 22, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 22, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 22, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 11, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 13, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 12, 2016 | NWAP | NEW APPLICATION ENTERED | — |