Drawing for SO DEEP SAM NC

USPTO serial 87268911

SO DEEP SAM NC

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
LEE, DOUGLAS
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SO DEEP SAM NC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

WILLIAM R. BORCHERS

WILLIAM R. BORCHERS JACKSON WALKER, LLP112 EAST PECAN STREETSUITE 2400SAN ANTONIO, TX 78205

Goods and services

ClassDescriptionStatusFirst use
037Vacuum excavation services; Building construction observation, namely, static inspection, functional verification inspection, and performance verification inspection; Repair, servicing and maintenance of vacuum excavation trucks and related accessories and equipment, including, but not limited to, traffic control and safety equipment, and survey and surface geophysical equipment to locate and document "as built" utility informationACTIVE—
040Custom manufacture and assembly of vacuum excavation trucks and related accessories and equipment, including, but not limited to, traffic control and safety equipment, and survey and surface geophysical equipment to locate and document "as built" utility informationACTIVE—
042Mapping services featuring land surveying, aerial mapping via helicopter flight, fixed-wing aircraft services and unmanned aircraft systems (UAS) flight operations utilizing airborne sensor technologies and light detection and ranging (LiDAR)-based technology, mobile mapping; near shore and inland water hydrographic surveying; right-of-way acquisition oversight and management services, namely, professional consultation in the field of surveying rights-of-way; Providing on-line non-downloadable geographic information system (GIS) software; Providing desktop, enterprise based and field-based, on-line non-downloadable geographic information system (GIS) software; Hosting an online website featuring geographic information system (GIS) software; Software consultation in the field of geographic information system (GIS) software; Design, development and implementation of geographic information system software; engineering services, namely, technical project planning and analysis in the field of geographic information systems; Database design and development in the field of geographic information system (GIS); Computer services, namely, database development services, namely configuration and customization of computer databases containing geographic information; Conducting geological surveys utilizing terrestrial scanning; Inspection services, namely, detection of leaks in underground utility pipes such as water and/or sewer; Providing third-party construction phase engineering services; Providing quality control services for the construction industry; Developing quality control standards for construction; Subservice utility engineering services including engineering services related to identifying and mapping the location of underground utilities utilizing concepts of Utility Quality Levels and various mapping methodologies and technologies; Coordinate the relocation of utilities, namely, locating and marking placement of underground utility pipes, cable or wires; Land title surveying in regard to coordinating the relocation of utilities including rights of way and easements within or immediately surrounding a given lot, parcel or quantity of real estate; Land surveying services, namely, conventional route surveys, GPS control surveys, and utility tunnel surveys; and photogrammetry services, terrain modeling, namely, services in the nature of mapping for locating and marking placement of underground utility pipes, cable or wires, quality assurance and quality control management for others in the field of construction, namely, surveying, aerial mapping and engineeringACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Feb 10, 2020MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Feb 10, 2020ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Jul 12, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 10, 2019EX2GSOU EXTENSION 2 GRANTED—
Jul 10, 2019EXT2SOU EXTENSION 2 FILED—
Jul 10, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 12, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 10, 2019EX1GSOU EXTENSION 1 GRANTED—
Jan 10, 2019EXT1SOU EXTENSION 1 FILED—
Jan 10, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 10, 2018NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 15, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 15, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 25, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 12, 2018ALIEASSIGNED TO LIE—
Apr 5, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 28, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 27, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 27, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 27, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 27, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 27, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 22, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 21, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 21, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 21, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 21, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 21, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 16, 2017DOCKASSIGNED TO EXAMINER—
Dec 21, 2016MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Dec 20, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—

Frequently asked questions

Related guidance