Drawing for CEMIMAX

USPTO serial 87284903

CEMIMAX

Reviewed by CopyMark Law Group

Reg. 5388132Status 710
Filing date
Status date
Registration date
Jan 23, 2018
Examiner
GUTTADAURO, JULIE MARIE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with CEMIMAX?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
001Adhesives for industrial purposes; Adhesives for paperhanging; Adhesives for wall tiles; Adhesives for wallpaper; Gelatine glue for industrial purposes; Glue for industrial purposes; Gum arabic for industrial purposes; Gum arabic glue for industrial purposes; Plastisols; Viscose (cellulose ester) chemicals; Viscose chemicals for use in manufacturing; Adhesives for foundry bindingSECTION 8 - CANCELLEDSep 11, 2017
019Cement; Concrete; Fireproof cement coatings; Grout; Gypsum; Mortar for building; Wooden floor boards; Bituminous roof coatings; Color coatings sold as an integral component of glass panels for building purposes; Facing mortar; Fireproof cement coatings; Glass mosaics for use in building construction; Tar coatings for use on roofs, walls and pavements; Wall system consisting of reinforced, dry-stacked, engineered concrete block with insulating core and coated with surface bond cementSECTION 8 - CANCELLEDSep 11, 2017

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 2, 2024C8..CANCELLED SEC. 8 (6-YR)—
Jan 23, 2023REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jan 23, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 19, 2017SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Dec 18, 2017CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Dec 12, 2017SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Dec 8, 2017AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Nov 27, 2017IUAFUSE AMENDMENT FILED—
Nov 27, 2017EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Nov 27, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 4, 2017NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 9, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 9, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 19, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 19, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 26, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 26, 2017DOCKASSIGNED TO EXAMINER—
Jan 11, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 2, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance