Drawing for ENERGY GATEWAY

USPTO serial 87295620

ENERGY GATEWAY

Reviewed by CopyMark Law Group

Reg. 5495077Status 710
Filing date
Status date
Registration date
Jun 19, 2018
Examiner
HUSSAIN, TASNEEM
Law office
PETITIONS OFFICE

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ENERGY GATEWAY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Steven A Abreu

STEVEN A ABREU Sunstein LLP100 High StreetBOSTON, MA 02110UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity, in particular ignition batteries; electric batteries for vehicles; electricity conduits; battery cables for motor vehicles; power cables for motor vehicles; starter cables for motors and engines; insulated and non-insulated electric wires and electric cables, in particular made of copper, aluminum or metal alloys; electric wires; electric cables; fuse wire made from metal alloys; connectors for electric conduits; electrical connectors; clamps for electric connectors, in particular battery terminals; electric connectors; joint sleeves for electric cables; calculating machines; data processing equipment and computers, in particular data processing equipment, in particular integrated circuits for motor vehicle electronics, in particular for measuring battery conditionSECTION 8 - CANCELLED—
017Sealing and insulating materials, in particular insulating material for cablesSECTION 8 - CANCELLED—
037Repair and installation services, in particular installation and repair of electronic apparatus; repair and maintenance of data technology installations, in particular hardwareSECTION 8 - CANCELLED—
042Scientific and technological services and research and design relating thereto, in particular engineering, construction draftingSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 3, 2025C8..CANCELLED SEC. 8 (6-YR)—
Jun 19, 2023REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Feb 10, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 7, 2019CORVREVIEW OF CORRESPONDENCE COMPLETE - CERTIFICATE OF REG MAILED—
Jun 5, 2019PCGRPETITION TO DIRECTOR GRANTED—
Jun 4, 2019APETASSIGNED TO PETITION STAFF—
Jan 9, 2019TPDRTEAS PETITION TO DIRECTOR RECEIVED—
Jun 19, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 14, 2018DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Apr 30, 2018AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Apr 9, 2018IUCNNOTICE OF ALLOWANCE CANCELLED—
Apr 9, 2018D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Dec 12, 2017NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Oct 17, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 17, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 27, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 14, 2017FIXDELECTRONIC RECORD REVIEW COMPLETE—
Sep 8, 2017ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Sep 5, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 29, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 29, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 23, 2017ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jun 28, 2017GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jun 28, 2017GNSLLETTER OF SUSPENSION E-MAILED—
Jun 28, 2017CNSLSUSPENSION LETTER WRITTEN—
Jun 27, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 27, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 10, 2017ALIEASSIGNED TO LIE—
Jun 8, 2017ALIEASSIGNED TO LIE—
May 15, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 4, 2017GEANNOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Apr 4, 2017GEAPEXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Apr 4, 2017EPENCOMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION AUTOMATIC ENTRY—
Apr 4, 2017CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED—
Apr 4, 2017DOCKASSIGNED TO EXAMINER—
Jan 17, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 13, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance