USPTO serial 87321259
FIELDCORE
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Oct 29, 2019
- Examiner
- MCCAULEY, BRENDAN D
- Law office
- Historical data usage
What this means
Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.
Need help with FIELDCORE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
GE INFRASTRUCTURE TECHNOLOGY LLC
GREENVILLE, SC, US
GE VERNOVA INFRASTRUCTURE TECHNOLOGY LLC
GREENVILLE, SC, US
Other trademarks owned by GE VERNOVA INFRASTRUCTURE TECHNOLOGY LLC
Schenectady, NY, US
Schenectady, NY, US
Schenectady, NY, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Dyan House
Dyan House Baker & McKenzie LLP1900 N. Pearl Street, Suite 1500Dallas, TX 75201United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 035 | business consulting services in the fields of power generation, oil and gas, wind energy, hydroelectric energy, distributed power, and nuclear energy | ACTIVE | May 1, 2018 |
| 037 | Installation, maintenance and repair of gas turbines, steam turbines, wind turbines, compressors, boilers, pumps, motors, control systems, engines, and industrial equipment parts; Power plant operation services, namely, maintenance and repair of power plants and power plant equipment; Power plant upgrade services, namely, installation, maintenance and repair of power plants and power plant equipment; Technical support services, namely, providing system upgrades, maintenance, installation of computer hardware; Technical support services related to modular replacements, namely, modular replacement installation of of gas turbines, steam turbines, wind turbines, compressors, boilers, pumps, motors, control systems, engines, and industrial equipment parts; Technical support services related to scheduled and forced power plant outages and power plant start-up support, namely, troubleshooting in the nature of technical advice and repair of gas turbines, steam turbines, wind turbines, compressors, boilers, pumps, motors, control systems, engines, and industrial equipment parts | ACTIVE | May 1, 2018 |
| 041 | System and equipment training services in the fields of power generation, oil and gas, wind energy, hydroelectric energy, distributed power, and nuclear energy | ACTIVE | May 1, 2018 |
| 042 | Engineering services in the fields of power generation, oil and gas, wind energy, hydroelectric energy, distributed power, and nuclear energy; Engineering consulting services in the fields of power generation, oil and gas, wind energy, hydroelectric energy, distributed power, and nuclear energy; Inspection services in the fields of power generation and oil and gas, namely, oil burner inspection; Inspection services in the fields of power generation, oil and gas, wind energy, hydroelectric energy, distributed power, and nuclear energy, namely, of gas turbines, steam turbines, wind turbines, compressors, boilers, pumps, motors, control systems, engines inspection, and industrial equipment parts inspection; Technical support services related to scheduled and forced power plants outages and power plant start-up support, namely, monitoring technological functions of computer network systems for power plants | ACTIVE | May 1, 2018 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by GE INFRASTRUCTURE TECHNOLOGY LLC
- Other trademarks owned by GE VERNOVA INFRASTRUCTURE TECHNOLOGY LLC
- Other trademarks owned by General Electric Company
- Other trademarks owned by General Electric Company
- Other trademarks owned by General Electric Company
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 041
- Other trademarks in Class 042
- Similar marks named FIELDCORE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 29, 2026 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jan 29, 2026 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jan 29, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 27, 2025 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Oct 8, 2025 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Oct 29, 2024 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Dec 13, 2023 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Oct 29, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 21, 2019 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Sep 20, 2019 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Sep 20, 2019 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Sep 18, 2019 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Aug 23, 2019 | IUAF | USE AMENDMENT FILED | — |
| Aug 23, 2019 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| May 2, 2019 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 30, 2019 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Apr 30, 2019 | EXT2 | SOU EXTENSION 2 FILED | — |
| Apr 30, 2019 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 10, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 8, 2018 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Oct 8, 2018 | EXT1 | SOU EXTENSION 1 FILED | — |
| Oct 8, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| May 8, 2018 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 13, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 13, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 21, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 7, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 26, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 26, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 26, 2018 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Oct 12, 2017 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 12, 2017 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 12, 2017 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 19, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 18, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 18, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 28, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 28, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 28, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 21, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 7, 2017 | MPMK | NOTICE OF PSEUDO MARK E-MAILED | — |
| Feb 6, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 4, 2017 | NWAP | NEW APPLICATION ENTERED | — |