Drawing for Serial No. 87332110

USPTO serial 87332110

Serial No. 87332110

Reviewed by CopyMark Law Group

Reg. 5591008Status 702Registered
Filing date
Status date
Registration date
Oct 23, 2018
Examiner
FALK, JONATHAN ROBERT
Law office
Historical data usage

What this means

Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with Serial No. 87332110?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Barry Horwitz

Barry Horwitz Greenberg Traurig, LLP77 W. Wacker DriveSuite 3100Chicago, IL 60601

Goods and services

ClassDescriptionStatusFirst use
009electrical and electronic products, namely, electrical measuring instruments, namely, instruments for determining the voltage at which electrical insulation breaks down, instruments for measuring the resistance of electrical grounding connection to the earth, instruments for measuring the electrical resistance of electrical insulation, instruments for measuring the leakage current present in electrical insulation, instruments for verifying the functionality of electrical products, and replacement parts for electrical measuring instruments, namely, voltmeters, ammeters, electrical switches, potentiometers, and current transformers, and multiplexers for electrical safety compliance testing, instruments for determining the voltage at which electrical insulation breaks down, instruments for measuring the resistance of electrical grounding connection to the earth, instruments for measuring the electrical resistance of electrical insulation, instruments for measuring the leakage current present in electrical insulation, instruments for verifying the functionality of electrical products, and electrical power supply frequency converters, AC electrical power supplies, DC electrical power supplies, DC electronic load measurers and testers, AC Electronic load measurers and testers, AC source measurers and testers, DC source measurers and testers, AC electrical power supply measurers and testers, DC electrical power supply measurers and testers, and AC electrical power supplies which may be interconnected and are provided with changes to the available options depending on the number of AC electrical power supplies that are interconnected, and electrical safety compliance analyzers for use by the producers of electrical products for testing for compliance with industry standards for AC hipot, DC hipot, forty amp ground bond, insulation resistance, and functional run or line leakage, and for testing manufactured electric products, namely, computers, lighting fixtures, lighting ballasts, appliances, medical devices, motors, printed circuit boards (PCBs) and components of PCB's, and instruments for determining the voltage at which electrical insulation breaks down, instruments for measuring the resistance of electrical grounding connection to the earth, instruments for measuring the electrical resistance of electrical insulation, instruments for measuring the leakage current present in electrical insulation, and instruments for verifying the functionality of electrical products, and electrical and electronic measuring and testing devices provided with user adjustable settings for powering up for use in measuring and testing electrical power fluctuations; and software for use in testing electrical safety products to ensure compliance with regulations, and to set up electrical safety products for their intended use, and to analyze the results of the tests of electrical safety products; and computer software for recording test data, archiving test data, importing test data into a spreadsheet or database, logging test data, statistically analyzing test data, and reviewing test data; electrical and electronic instruments for measuring and testing the performance, strength and efficiency of electronic and/or electrical products; and electronic test instrument and associated software for use in electrical safety testing electrical measuring instruments for testing the dielectric strength of electronic/electrical products; electrical circuits used to monitor current leakage from electrical safety testing devices to the ground sold as a component part of the electrical safety testing devices; re-calibration warning signal that provides a warning when calibration is due sold as a component electrical safety compliance testing apparatus; electronic self-verification feature that tests for proper operation sold as a component of electrical safety compliance testing apparatus; electrical measuring instruments used for testing the safety ground circuit of consumer and industrial products; electronic test systems comprised primarily of printed circuit boards, computer software in the field of testing electronic equipment, housings, transformers, liquid crystal displays also known as LCDs, electrical instruments used to test commercial products on a variety of electrical safety specifications including tests for AC hipot, DC hipot, insulation resistance, ground bond, functional run and line electricity leakage test, electrical instruments used to perform electricity leakage tests on commercial products, electrical instruments used to apply preselected electrical power loads to simulate possible power loads when using the products being tested, and electrical instruments used to simulate fault conditions while tests are in process; systems for testing electronic equipment comprised primarily of printed circuit boards, computer software in the field of testing electronic equipment, housings, transformers, liquid crystal displays also known as LCDs, electrical instruments used to test commercial products on a variety of electrical safety specifications including tests for AC hipot, DC hipot, insulation resistance, ground bond, functional run and line electricity leakage test, electrical instruments used to perform electricity leakage tests on commercial products, electrical instruments used to apply preselected electrical power loads to simulate possible power loads when using the products being tested, and electrical instruments used to simulate fault conditions while tests are in process; electronic testers used in testing medical equipment; computer software for electronic testing of medical equipment; electronic testers for electronic medical equipment; and replacement parts thereforACTIVEJan 1, 2018

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 12, 2024NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Dec 12, 2024C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Dec 7, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 1, 2024E815TEAS SECTION 8 & 15 RECEIVED—
Oct 23, 2023REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Feb 26, 2022CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Feb 26, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 26, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 26, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 26, 2022COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Oct 23, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 15, 2018SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Sep 14, 2018CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Sep 11, 2018EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 8, 2018SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Sep 8, 2018AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Aug 10, 2018IUAFUSE AMENDMENT FILED—
Aug 10, 2018EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Mar 2, 2018EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Feb 28, 2018EX1GSOU EXTENSION 1 GRANTED—
Feb 28, 2018EXT1SOU EXTENSION 1 FILED—
Feb 28, 2018EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 12, 2017NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 18, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 18, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 28, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 8, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 7, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 7, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 7, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 10, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 10, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 10, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 5, 2017DOCKASSIGNED TO EXAMINER—
Feb 17, 2017MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Feb 16, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 14, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance