These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 604: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with SCI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Thomas J. Moore

THOMAS J MOORE BACON & THOMAS PLLC625 SLATERS LANEFOURTH FLOORALEXANDRIA, VA 22314-1176

Goods and services

ClassDescriptionStatusFirst use
009electrical and electronic products, namely, electrical measuring instruments, namely, instruments for determining the voltage at which electrical insulation breaks down, instruments for measuring the resistance of electrical grounding connection to the earth, instruments for measuring the electrical resistance of electrical insulation, instruments for measuring the leakage current present in electrical insulation, instruments for verifying the functionality of electrical products, and replacement parts for electrical measuring instruments, namely, voltmeters, ammeters, electrical switches, potentiometers, and current transformers, and multiplexers for electrical safety compliance testing, instruments for determining the voltage at which electrical insulation breaks down, instruments for measuring the resistance of electrical grounding connection to the earth, instruments for measuring the electrical resistance of electrical insulation, instruments for measuring the leakage current present in electrical insulation, instruments for verifying the functionality of electrical products, and electrical power supply frequency converters, AC electrical power supplies, DC electrical power supplies, DC electronic load measurers and testers, AC Electronic load measurers and testers, AC source measurers and testers, DC source measurers and testers, AC electrical power supply measurers and testers, DC electrical power supply measurers and testers;, and AC electrical power supplies which may be interconnected and are provided with changes to the available options depending on the number of AC electrical power supplies that are interconnected, and electrical safety compliance analyzers for use by the producers of electrical products for testing for compliance with industry standards for AC hipot, DC hipot, forty amp ground bond, insulation resistance, and functional run or line leakage, and for testing manufactured electric products, namely, computers, lighting fixtures, lighting ballasts, appliances, medical devices, motors, printed circuit boards (PCBs) and components of PCB's, and instruments for determining the voltage at which electrical insulation breaks down, instruments for measuring the resistance of electrical grounding connection to the earth, instruments for measuring the electrical resistance of electrical insulation, instruments for measuring the leakage current present in electrical insulation, and instruments for verifying the functionality of electrical products, and electrical and electronic measuring and testing devices provided with user adjustable settings for powering up for use in measuring and testing electrical power fluctuations; and software for use in testing electrical safety products to ensure compliance with regulations, and to set up electrical safety products for their intended use, and to analyze the results of the tests of electrical safety products; and computer software for recording test data, archiving test data, importing test data into a spreadsheet or database, logging test data, statistically analyzing test data, and reviewing test data; electrical and electronic instruments for measuring and testing the performance, strength and efficiency of electronic and/or electrical products; and electronic test instrument and associated software for use in electrical safety testing electrical measuring instruments for testing the dielectric strength of electronic/electrical products; electrical circuits used to monitor current leakage from electrical safety testing devices to the ground sold as a component part of the electrical safety testing devices; re-calibration warning signal that provides a warning when calibration is due sold as a component electrical safety compliance testing apparatus; electronic self-verification feature that tests for proper operation sold as a component of electrical safety compliance testing apparatus; electrical measuring instruments used for testing the safety ground circuit of consumer and industrial products; electronic test systems comprised primarily of printed circuit boards, computer software in the field of testing electronic equipment, housings, transformers, liquid crystal displays also known as LCDs, electrical instruments used to test commercial products on a variety of electrical safety specifications including tests for AC hipot, DC hipot, insulation resistance, ground bond, functional run and line electricity leakage test, electrical instruments used to perform electricity leakage tests on commercial products, electrical instruments used to apply preselected electrical power loads to simulate possible power loads when using the products being tested, and electrical instruments used to simulate fault conditions while tests are in process; systems for testing electronic equipment comprised primarily of printed circuit boards, computer software in the field of testing electronic equipment, housings, transformers, liquid crystal displays also known as LCDs, electrical instruments used to test commercial products on a variety of electrical safety specifications including tests for AC hipot, DC hipot, insulation resistance, ground bond, functional run and line electricity leakage test, electrical instruments used to perform electricity leakage tests on commercial products, electrical instruments used to apply preselected electrical power loads to simulate possible power loads when using the products being tested, and electrical instruments used to simulate fault conditions while tests are in process; electronic testers used in testing medical equipment; computer software for electronic testing of medical equipment; electronic testers for electronic medical equipment; and replacement parts thereforABANDONED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 25, 2019MAB4ABANDONMENT NOTICE E-MAILED - INTER PARTES DECISION—
Jun 25, 2019ABN4ABANDONMENT - AFTER INTER PARTES DECISION—
Jun 24, 2019TMBNTTAB RELEASE CASE TO TRADEMARKS—
Jun 24, 2019OP.TOPPOSITION TERMINATED NO. 999999—
Jun 24, 2019OP.DOPPOSITION DISMISSED NO. 999999—
Sep 24, 2018OP.IOPPOSITION INSTITUTED NO. 999999—
Apr 19, 2018ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Mar 27, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 27, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 7, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 16, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 22, 2018RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Jul 19, 2017GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jul 19, 2017GNSLLETTER OF SUSPENSION E-MAILED—
Jul 19, 2017CNSLSUSPENSION LETTER WRITTEN—
Jun 28, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 28, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 28, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 10, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 10, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 10, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 5, 2017DOCKASSIGNED TO EXAMINER—
Feb 17, 2017MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Feb 16, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 14, 2017NWAPNEW APPLICATION ENTERED—