Drawing for SYNERGY LINK

USPTO serial 87334179

SYNERGY LINK

Reviewed by CopyMark Law Group

Reg. 5694318Status 705Registered
Filing date
Status date
Registration date
Mar 12, 2019
Examiner
HOPKINS II, DEAN ANDREW
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights. Track next renewal deadlines in TSDR and WIPO records.

Status 705: Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights.

Need help with SYNERGY LINK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jerald E. Nagae, Reg. No. 29,418

Jerald E. Nagae, Reg. No. 29,418 CHRISTENSEN O'CONNOR JOHNSON KINDNESS1201 Third Avenue, Suite 3600SEATTLE, WA 98101United States

Goods and services

ClassDescriptionStatusFirst use
007[ Alternators; Direct current generators ]SECTION 8 - CANCELLED—
009Power conditioners; Power conditioners for solar power generation; Power conditioners for electric batteries; [ Power conditioners for wind generation; Power conditioners for small hydroelectric generation; ] Power distribution or control machines and apparatus for distributing and controlling the wireless transmission of high frequency electrical power from a power source to a power receiver in the nature of electrical power distribution units and power controllers; Remote maintenance and monitoring apparatus for use in power conditioners for solar power generation, namely, remote energy meters for tracking and monitoring solar energy usage; Remote maintenance and monitoring apparatus for use in machines and apparatus for electric batteries, namely, remote energy meters for tracking and monitoring electric battery energy usage; [ Remote maintenance and monitoring apparatus for use in machines and apparatus for wind generation, namely, remote energy meters for tracking and monitoring wind energy usage; Remote maintenance and monitoring apparatus for use in machines and apparatus for small hydroelectric generation, namely, remote energy meters for tracking and monitoring hydroelectric energy usage; ] Remote maintenance and monitoring apparatus for use in power distribution or control machines and apparatus, namely, remote energy meters for tracking and monitoring solar energy usage; [ Electrical and electronic fire alarms; Electrical and electronic gas alarms; Electrical and electronic burglar alarms; Electrical and electronic anti-theft warning apparatus, namely, burglar alarms; Transformers; Voltage regulators; Electric switches; Power distribution panels; Rotary converters; Electrical power phase modifiers to optimize the wireless transmission of electrical power from a power source to a power receiver; Electric and magnetic meters; Electric and magnetic meters and tests, namely, ammeters, voltmeters, wattmeters and phase indicators; Electric batteries; Batteries; Electrical batteries and cells; Solar batteries; Electric wires and cables; ] Machines and apparatus for energy management, namely, electric controllers for energy management; Electric control devices for energy management; Software for energy management; Software for use in system for cooperative control of energy or group control of energy; Electric system controller for cooperative control of energy or group control of energy; System comprised primarily of electric controllers and electric meters for cooperative control of energy or group control of energy; Electric control devices for use in system for cooperative control of energy and group control of energyACTIVE—
037[ Construction consultancy; Operation and maintenance of building equipment; Repair or maintenance of electric motors; Repair or maintenance of power distribution or control machines and apparatus; Repair and maintenance of electricity generators; Repair or maintenance of measuring and testing machines and instruments; Repair or maintenance of electronic machines and apparatus ]SECTION 8 - CANCELLED—
038Transmission of information through cooperative control system of energy or group control system of energy, namely, transmission of information by electronic communications networks powered by cooperative control systems of energy and group control systems of energyACTIVE—
042[ Advisory and consultancy relating to development, design, creation or maintenance of software for computer systems for cooperative control system of energy or group control system of energy; Computer software design, computer programming, or maintenance of computer software; Technological advice relating to computers, namely, computer consulting, and technological consulting in the field of the design and manufacture of automobiles and industrial machines; Designing of machines, apparatus, instruments or systems composed of such machines, apparatus and instruments; construction of computer systems for cooperative control of energy or group control of energy, namely, design and development of computer hardware and software systems ]SECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 9, 2025NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jul 9, 2025C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jul 9, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 11, 2025E815TEAS SECTION 8 & 15 RECEIVED—
Mar 12, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Mar 12, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 6, 2019DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Feb 6, 2019AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Dec 28, 2018IUCNNOTICE OF ALLOWANCE CANCELLED—
Dec 28, 2018D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Sep 11, 2018NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 17, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 17, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 27, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 12, 2018PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 8, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 8, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Jun 8, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 8, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 8, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 8, 2018ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
May 26, 2018PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
May 10, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 8, 2018XAECEXAMINER'S AMENDMENT ENTERED—
May 8, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 8, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
May 8, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 4, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 3, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 3, 2018ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Dec 21, 2017GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Dec 21, 2017GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 21, 2017CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 25, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 25, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 19, 2017ALIEASSIGNED TO LIE—
Nov 8, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 9, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 9, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 9, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 8, 2017DOCKASSIGNED TO EXAMINER—
Feb 21, 2017TAEATEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED—
Feb 21, 2017PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Feb 18, 2017MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Feb 17, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 16, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance