Drawing for BLACK & MCDONALD

USPTO serial 87340649

BLACK & MCDONALD

Reviewed by CopyMark Law Group

Reg. 5625075Status 702Registered
Filing date
Status date
Registration date
Dec 11, 2018
Examiner
ALESKOW, DAVID HOWARD
Law office
Historical data usage

What this means

Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with BLACK & MCDONALD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Terrence J. McAllister

Terrence J. McAllister Ruggiero McAllister & McMahon LLCOne Landmark Square, 18th FloorSTAMFORD, CT 06901United States

Goods and services

ClassDescriptionStatusFirst use
035Business cost management services in the construction field; business project management services for construction projects, business consulting services in the field of construction, namely, estimating construction costsACTIVESep 21, 2009
037Electrical contracting services, installation of electrical systems, electrical repair and installation of lighting, electrical repair and installation of electrical motors, electrical repair and installation of air conditioners, electrical repair and installation of heaters, repair of electric lights; general building contractor services, pipeline construction and maintenance, maintenance and repair of pipelines, repair and maintenance of air-conditioning apparatus for industrial purposes, repair and maintenance of boilers, repair and maintenance of booster pumps, cable laying, laying of cable, fire alarm installation and repair, repair and maintenance of fire alarms, traffic light installation, repair and maintenance; building maintenance and repair, maintenance and repair of heating installations, repair and maintenance of integrated circuits manufacturing machines and systems, repair and maintenance of gas water heaters, repair and maintenance of nuclear power plants, plumbing, plumbing services, plumbing contracting services, heating equipment installation and repair, freezing and refrigerator equipment installation and repair, repair and maintenance of boilers, repair services for electric generators and wind turbines; Installation of electrical and generating machinery, installation and maintenance of photovoltaic installations, installation and maintenance of solar thermal installations; masonry, laying of carpet, repair and maintenance of building scaffolds, working and building platforms, painting and repair of signs, Sign painting, general building construction contracting services, building construction services, bridge construction services, construction and renovation of buildings, construction and repair of buildings, construction of buildings, construction of airports, construction of medical establishments, construction of residential and commercial properties, road construction services, repair and maintenance of building scaffolds, working and building platforms, plastering services, laying and construction of pipelines, oil pipeline construction, factory construction, cementing services for oil and gas wells, air conditioning vent sealing services; building construction supervision; construction planning; consultation in building construction supervision; building inspection; project management in the field of building constructionACTIVESep 21, 2009
039Utility services, namely, transmission of electricity and natural gasACTIVESep 21, 2009
040Waste management services; metal fabrication and finishing services for othersACTIVESep 21, 2009
042Architectural design, design and development of computer hardware for the manufacturing industries, industrial design, design, planning and engineering of compressed-air stations, design and testing of new products for others, civil engineering drawing services, construction drafting; providing quality assurance services in the field of construction; inspection of fire alarm systems; pipeline inspection services; reviewing standards and practices to assure compliance with environmental regulationsACTIVESep 21, 2009

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 7, 2025NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Oct 7, 2025C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Oct 6, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 4, 2025E815TEAS SECTION 8 & 15 RECEIVED—
Dec 11, 2023REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Dec 11, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 25, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 25, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 5, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 20, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 20, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 20, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 13, 2018ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
May 29, 2018GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
May 29, 2018GNSIINQUIRY TO SUSPENSION E-MAILED—
May 29, 2018CNSISUSPENSION INQUIRY WRITTEN—
Nov 28, 2017GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Nov 28, 2017GNSLLETTER OF SUSPENSION E-MAILED—
Nov 28, 2017CNSLSUSPENSION LETTER WRITTEN—
Nov 28, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 28, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 13, 2017ALIEASSIGNED TO LIE—
Nov 1, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 22, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 22, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 22, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 12, 2017DOCKASSIGNED TO EXAMINER—
Feb 25, 2017MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Feb 24, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 21, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance