Drawing for MCLAREN ENGINEERING GROUP APPLIED INGENUITY

USPTO serial 87379422

MCLAREN ENGINEERING GROUP APPLIED INGENUITY

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
ADEYIGA, ADETAYO JANET
Law office
TMEG LAW OFFICE 109

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 600: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with MCLAREN ENGINEERING GROUP APPLIED INGENUITY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

David Cykiert

DAVID CYKIERT ROBINSON BROG875 THIRD AVENUENEW YORK, NY 10022UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
042Engineering Services, namely, relating to: accident reconstruction; ALTA/ASCM title survey; amusement rides and devices; animations and pre-visualization studies; boundary surveys; bridge collapse; bridge inspection; bridge construction and maintenance; building collapse; building construction and maintenance; bulkhead construction and maintenance; building code compliance and technical peer review; concrete construction and maintenance; litigation support and expert testimony in construction related claims; construction failure analysis; corrosion investigations and mitigation design; crane installation; custom rigging design; curtain wall facade design; structure demolition and removal; underwater diving for inspection of structures or utilities; drainage studies, design and hydrology; entertainment venue and theater structural design and renovation; erosion control; analysis and design of tensile fabric roof structures; FEMA floodplain ordinance compliance, building elevation survey and certification; flood plain impact; foundations design, construction and maintenance; geotechnical and soil engineering; glass and glazing; highway design; hydrographic surveys; light gage metal framing; machinery operation and implementation; marina design, construction and maintenance; marine borers operation and implementation; marine engineering, including the design of ports, terminals, piers, wharves, berthing, mooring, and fendering systems, bridges, dams, bulkheads and relieving platforms; marine facility design, construction and maintenance; construction material and/or system failure analysis; mechanized effects and entertainment equipment operation and implementation; pavement installation; pedestrian bridge construction and maintenance; pier design, construction and maintenance; precast concrete design, construction and maintenance; prestressed concrete design, construction and maintenance; pre-visualization modeling and animation; structural design with recycled plastic lumber; retaining wall design, construction and maintenance; scenery/theming and touring stage design, construction and maintenance; seismic design; ship collision analysis; ship fendering; ship and cruise terminal design, construction and maintenance; private and public development site master planning and layout; stage equipment design, construction and maintenance; structural steel- and cold formed steel-framed building design; storm water management plans; material and component stress, fatigue failure analysis; condition assessment, review, analysis and retrofit of existing structures; assessment of structural failures; parcel subdivision and land development surveys; topographic and utility surveying; resolution of boundary disputes via survey; television and film production staging and stunt structural design; theatre design, construction and maintenance; themed architectural elements and sculpture design, construction and maintenance; timber structure design, construction and maintenance; topographic surveys; underwater inspection of marine and coastal structures; utilities design, implementation and maintenance; and, wharf design, construction and maintenanceACTIVEJan 1, 2005

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 11, 2019MAB0ABANDONMENT NOTICE MAILED - INCOMPLETE RESPONSE—
Mar 11, 2019ABN0ABANDONMENT - INCOMPLETE RESPONSE—
Aug 21, 2018RDX3NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED—
Aug 21, 2018RDX1ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED—
Aug 21, 2018RRDXACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED—
Aug 21, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 21, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 15, 2018ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Apr 18, 2018GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Apr 18, 2018GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 18, 2018CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 29, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 29, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 29, 2018ALIEASSIGNED TO LIE—
Mar 15, 2018NREVNOTICE OF REVIVAL - E-MAILED—
Mar 15, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 15, 2018PETGPETITION TO REVIVE-GRANTED—
Mar 15, 2018PROATEAS PETITION TO REVIVE RECEIVED—
Jan 11, 2018MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jan 11, 2018ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jun 15, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 15, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 15, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 14, 2017DOCKASSIGNED TO EXAMINER—
Mar 25, 2017MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Mar 24, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 24, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance