Drawing for DIAKONT

USPTO serial 87404499

DIAKONT

Reviewed by CopyMark Law Group

Reg. 5970015Status 710
Filing date
Status date
Registration date
Jan 28, 2020
Examiner
GARDNER, DAWNA BERYL
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with DIAKONT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Alexander Lazouski

Alexander Lazouski Lazouski IP LLCSuite 1, 14726 Bowfin Ter.Lakewood Ranch, FL 34202UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Parts for actuator assembly machines, not land vehicles, namely, shaft couplings, axles, transmission shafts, bearing housings, pulleys, joints, bearings and clutches all for actuator assembly machines; cowlings as parts of drive cooling machinery systems, other than for land vehicles; drilling bit heads as parts of machines; elevating apparatus, namely reactor refueling machines; pumps for machines, engines or motors; stuffing boxes as parts of machines hermetically closing the gap between the moving and stationary parts of the machines; machine parts, namely, guides; mechanical lifting apparatus; handling apparatus, namely loading and unloading machines; regulators as parts of machines; propulsion mechanisms, other than for land vehicles, namely, electromechanical linear actuators; motors of actuators, motors for model aircraft; bridge cranes; taps as parts of machines, engines or motors; machine wheelwork; machine wheels; power-operated reels for flexible hoses; cargo handling machines; automatic manipulators as machines for handling, assembling, equipment maintenance, repair processes; industrial robots as machines for handling, assembling, equipment maintenance, repair processes; cartridges for filtering machines; pulleys being parts of machines, engines or motors; thermostatic control valves for machines; gears, other than for land vehicles, transmission gears other than for land vehicles, gear boxes, other than for land vehicles, planetary gears, other than for land vehicle, epicyclic gears, other than for land vehicles, roller screws, other than for land vehicles; reduction gears, other than for land vehicles; electric motors for machines; dust exhausting installations for cleaning purposes; dust removing installations for cleaning purposes; high pressure washers; 3D printersSECTION 8 - CANCELLEDJun 27, 2011
009Electric coils, namely, transformers; calibrating rings; electric anti-interference devices; electric distribution boxes; lenses for astrophotography; audiovisual recordings featuring music and animation for use in teaching; close-up lenses; electrical terminal boxes; electrical connection boxes; sheaths for electric cables; slide calipers; jigs as measuring instruments; boiler control instruments; printed circuits; electric installations for the remote control of industrial operations; electric switchboxes; commutators; camera eyepieces; electric conductors; electric circuit closers; electric connectors; electric junction boxes; switchboards; contacts, electric; apparatus for regulating electric current; electronic meters for monitoring technological processes, namely, gas flow meters, flowmeters, sensors for determining position, velocity and pressure, coordinate measuring machines, electronic valves for controlling fluids, and electronic monitors to collect operational data and settings from HVAC equipment to ensure proper functioning; encoders of actuators; speedometers for vehicles; electric converters, rotary converters, frequency convertors of actuators; optical correcting lenses; camera optics, namely, camera lenses and objectives; electric commutators; distance measuring apparatus; distance recording sensors; electric distribution systems, namely, power distribution panels; electrical distribution boxes; measuring apparatus, namely, thickness measurers; water level indicators; electric measuring devices, namely, clamp meters to measure electricity; electric cables, electrical ducts; electrical control panels; connections for electric lines; couplings, electric; transmitters of electronic signals; testing apparatus for camera systems comprising cameras, camera control units and camera cables; high frequency switches; audio- and video-receivers; identification threads for electric wires; identification sheaths for electric wires; data processing apparatus; electric inverters; optical lamps; lasers, not for medical purposes; optical lenses; instruments containing eyepieces, namely, cameras and camera systems comprising cameras, camera control units and camera cables; periscopes; photographic speed measuring apparatus; tools for precision measuring; measuring instruments; tape rulers, folding rulers and graduated rulers all as measuring instruments; micrometer screws for optical instruments; microphones; optical prisms; observation instruments, namely, security surveillance robots, laboratory robots, camera systems comprising cameras, camera control units and camera cables; optical apparatus and instruments, namely, optical lenses, optical filters, optical reflectors, optical glasses for lenses and camera heads; recorded computer operating programs; computer program for vehicle steering systems; pyrometers; probes for testing integrated circuits; automated teaching apparatus, namely, computer workstations comprised of computer and computer hardware that train employees in the use of industrial machinery; electric wire connectors; electro-dynamic apparatus for the remote control of signals; simulators for the steering and control of vehicles; sound recording apparatus; sound reproduction apparatus; screw-tapping gauges; remote control apparatus, namely, remote controllers for camera systems; electronic control systems for hydraulic turbines, steam turbines, gas turbines, diesel generators other than for land vehicles, robots, manipulators, TV-systems, aircrafts and ships; electronic controls for motors of actuators; electronic servo motor controllers of actuators; temperature indicators; time recording apparatus; photovoltaic cells; video recorders; computer keyboards; integrated circuits; wafers for integrated circuits; computer programs for controlling the parameters of camera systems; integrated circuit chips for transforming and processing electronic data, signals and physical quantities; discharge tubes, electric, other than for lighting; computer operating programs recorded on DVD; computer software recorded on DVD for use in visual monitoring of technological processes and equipment; couplers as data processing equipment; light regulators, electric; optical character readers; optical discs featuring technical data reports; computer central processing units; electronic readers as data processing equipment; junction sleeves for electric cables; camcorders; diagnostic apparatus for pipeline inspection, diagnostic apparatus for underwater inspections; diagnostic apparatus for visual graphite inspection; video screens; downloadable computer operating programs; marine depth finders; voltage surge protectors; printed circuit boards; downloadable computer software applications for use in visual monitoring of technological processes and equipment; lens hoods; encoded key cards; computer hardware; battery chargers; accumulators, electric; signals, namely, luminous beacons; navigation apparatus for vehicles, namely, on-board computersSECTION 8 - CANCELLEDJun 27, 2011
037Electric appliance installation and repair; building construction supervision; disinfecting; machinery installation, maintenance and repair; pipeline construction and maintenance; plumbing; providing information on repair of machinery, computer hardware, electronic, electrical and video equipment; underwater repair; installation, maintenance and repair of computer hardware; interference suppression services for electrical apparatus; repair of power lines; laying of cableSECTION 8 - CANCELLEDJun 27, 2011

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 7, 2026C8..CANCELLED SEC. 8 (6-YR)—
Jan 28, 2025REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jan 28, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 12, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 12, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 23, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 9, 2019ALIEASSIGNED TO LIE—
Oct 3, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 3, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Oct 3, 2019GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 3, 2019GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 3, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 9, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 9, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 9, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 6, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 6, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 27, 2019GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 27, 2019GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 27, 2019CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Feb 25, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 23, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 23, 2019ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 24, 2018GNS1NOTIFICATION OF SUBSEQUENT FINAL EMAILED—
Aug 24, 2018GNSFSUBSEQUENT FINAL EMAILED—
Aug 24, 2018CFRCSUBSEQUENT FINAL REFUSAL WRITTEN—
Jul 31, 2018AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Jul 31, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 31, 2018PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Jul 30, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 30, 2018ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jan 30, 2018GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jan 30, 2018GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 30, 2018CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 8, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 6, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 6, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 6, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 7, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 7, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 7, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 30, 2017DOCKASSIGNED TO EXAMINER—
Apr 18, 2017MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Apr 15, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 13, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance