Drawing for INTEGRICT

USPTO serial 87462186

INTEGRICT

Reviewed by CopyMark Law Group

Reg. 5495445Status 710
Filing date
Status date
Registration date
Jun 19, 2018
Examiner
MCMORROW, RONALD G
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with INTEGRICT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Terrence J. McAllister

Terrence J. McAllister Ruggiero McAllister & McMahon LLCOne Landmark SquareStamford, CT 06901-2682UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Calculating machines, data processing equipment and computers; Apparatus for recording, transmission, processing and reproduction of sound, images or data; Batteries and battery chargers; Automatic pressure control machines and instruments; Automatic liquid-level control machines and instruments; Automatic liquid-flow control machines and instruments; Automatic fluid-composition control machines and instruments; Automatic combustion control machines and instruments; Automotive testing equipment, namely, handheld diagnostic scanners; Marine radio communication machines and apparatus; Marine depth finders; Marine compasses; Alarm monitoring systems for ships; Electrical power distribution units; Electrical controllers; Photovoltaic solar modules for production of electricity; Non-contact power supply system apparatus, namely, electrical power supplies; Transformers; Circuit breakers; Switchboards; Electrical and electronic control apparatus for improving power efficiency, namely, electric converters; Power supplies; Electricity transporting system apparatus comprised of electric cables, wires, conductors and connection fittings therefor; Power controllers; Electric control devices for energy management; Electric power converters; Power distributors, namely, distribution transformers, electrical power distribution blocks, electricity distribution consoles and electrical power distribution units; Power modules comprised of electrical switches, diodes, rectifiers, inverters; Apparatus for measuring the electricity consumption, namely, clamp meters; Apparatus for monitoring electricity consumption, namely, electronic monitors and monitor modules; Apparatus for analyzing electricity consumption, namely, electronic analyzers; Apparatus for diagnosing electrical power installations, namely, testing and measuring equipment for use in testing the performance and efficiency of power plant equipment; Electric power analyzers; Remote control apparatus, namely, remote controls for radios, televisions, stereos, remote controls for projectors, mechanical remote controls for motors, remote controls for massage chairs, remote control starters for vehicles, remote controls for gas stoves and fireplaces, electronic apparatus for the remote control of industrial operations; Remote measuring controllers for ships, namely, laser distance meters; Marine navigation apparatus, namely, GPS navigation devices; Downloadable computer software for remote monitoring and analysis of electrical energy consumption; Computer software platforms for energy management; Operating system programs; Computer programs for data processing in the field of electrical energy management; Autopilots for vessels in the nature of electronic controls for adjusting, steering, and keeping course for ships; Data collecting apparatus for ships, namely, depth gaugesSECTION 8 - CANCELLED—
042Development of operating system software for comprehensive protection power control; Remote server administration, namely, technical administration of servers for others and troubleshooting in the nature of diagnosing server problems; Design of computer systems for ship mechanism controls; Platform as a service (PAAS) featuring computer software platforms for use in the field of energy management; Development of software for secure network operations; Computer network configuration services; Design of power facilities; Design of power regulators; Design of generators; Design and drafting of construction plans for ships; Management services for power storage apparatus; Research and development of power converters, inverters, and chargers for use in renewable energy systems; Research and development of technology and new products in the field of renewable energy production; Research and development of technology and new products in the field of power storage systems; Power quality management services, namely, quality evaluation and analysis, quality assurance, and quality control, in the field electrical energy management; Diagnostic services in the field of power quality management equipment; Management of comprehensive protection power control operating systems, namely, remote monitoring of power control operating systems; Maintenance of power system monitoring and control software; Research in the field of energy; Research and development of technology for nuclear power or alternative energySECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 3, 2025C8..CANCELLED SEC. 8 (6-YR)—
Jun 19, 2023REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jul 18, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 18, 2022ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Jul 18, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 18, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 19, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 3, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 3, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 14, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 24, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 15, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 15, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 13, 2018ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Oct 2, 2017GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Oct 2, 2017GNSLLETTER OF SUSPENSION E-MAILED—
Oct 2, 2017CNSLSUSPENSION LETTER WRITTEN—
Sep 25, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 25, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 25, 2017ALIEASSIGNED TO LIE—
Sep 18, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 29, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 29, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 29, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 24, 2017DOCKASSIGNED TO EXAMINER—
Jun 1, 2017MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
May 31, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 27, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance