USPTO serial 87464193
BOND FORMWORK SYSTEMS
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Mar 27, 2018
- Examiner
- CORDOVA, RAUL
- Law office
- TMO LAW OFFICE 114
What this means
Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.
Need help with BOND FORMWORK SYSTEMS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Katy, TX, US
Katy, TX, US
Katy, TX, US
DORAVILLE, GA, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Timothy J. Maier
Timothy J. Maier Maier & Maier, PLLC345 South Patrick St.Alexandria, VA 22314UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Concrete shoring, form shoring and supporting equipment, namely, metal forms, fittings, parts and accessories for concrete forming equipment and apparatus, all of metal, namely, beams, girders, trusses, stringers, braces, extension legs, strongbacks, stiffbacks, walers, strongback shoes, tie-bolts, clamps, casters, rollers, bolts, nuts, pins, clips, bracing lugs, splices, tieplates, chord fillers, hangars, wall jacks, safety barriers, brace and plumb brackets, wall plumbing metal braces, catwalks, catwalk brackets, ledgers, knee braces, outriggers, wall forms, pan forms, column forms, beam forms, spandrel forms, tunnel forms and lifting slings; metal bearing and supporting constructions for formwork boards and formwork panels; metal formwork beams, anchors and ties for use in the concrete construction industry; roof and ceiling beams of metal, constituent parts of roof and ceiling beams of metal; metal bolts, metal blocking wedges, metal anchoring brackets, metal framing brackets, metal framed formwork, interchangeable metal hooks for framed formwork, all for use in formwork scaffolding in the concrete construction industry; metal formwork tables; load-bearing towers and stair towers for use in the concrete construction industry made of metal; hardware namely, wall bolts of steel for formwork elements; couplings, couplings of steel for formwork elements, scaffolding metal brackets, anchoring metal nuts, form metal ties, interlocking metal cones all for use in formwork; retaining metal pillars for use in formworks; automatic metal grapplers for use in formwork; metal brackets for use in the climbing technique for formwork, metal climbing formwork, metal dam formwork | ACTIVE | Jan 5, 2018 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Bond, Bradley
- Other trademarks owned by Bond, Bradley
- Other trademarks owned by Bond, Bradley
- Other trademarks owned by WHITE CAP, L.P.
- Other trademarks in Class 006
- Similar marks named BOND FORMWORK SYSTEMS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 26, 2026 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Nov 1, 2023 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Nov 1, 2023 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Nov 1, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 3, 2023 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Mar 27, 2023 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Mar 27, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 17, 2018 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Feb 16, 2018 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jan 29, 2018 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jan 29, 2018 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jan 16, 2018 | IUAF | USE AMENDMENT FILED | — |
| Jan 16, 2018 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Dec 26, 2017 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Oct 31, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 31, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 11, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 20, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 19, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 19, 2017 | ALIE | ASSIGNED TO LIE | — |
| Sep 19, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 19, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 19, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 30, 2017 | GPRN | NOTIFICATION OF PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Aug 30, 2017 | GPRA | PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Aug 30, 2017 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Aug 24, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 1, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 29, 2017 | NWAP | NEW APPLICATION ENTERED | — |