Drawing for BOND FORMWORK SYSTEMS

USPTO serial 87464193

BOND FORMWORK SYSTEMS

Reviewed by CopyMark Law Group

Reg. 5434755Status 702Registered
Filing date
Status date
Registration date
Mar 27, 2018
Examiner
CORDOVA, RAUL
Law office
TMO LAW OFFICE 114

What this means

Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with BOND FORMWORK SYSTEMS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Timothy J. Maier

Timothy J. Maier Maier & Maier, PLLC345 South Patrick St.Alexandria, VA 22314UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Concrete shoring, form shoring and supporting equipment, namely, metal forms, fittings, parts and accessories for concrete forming equipment and apparatus, all of metal, namely, beams, girders, trusses, stringers, braces, extension legs, strongbacks, stiffbacks, walers, strongback shoes, tie-bolts, clamps, casters, rollers, bolts, nuts, pins, clips, bracing lugs, splices, tieplates, chord fillers, hangars, wall jacks, safety barriers, brace and plumb brackets, wall plumbing metal braces, catwalks, catwalk brackets, ledgers, knee braces, outriggers, wall forms, pan forms, column forms, beam forms, spandrel forms, tunnel forms and lifting slings; metal bearing and supporting constructions for formwork boards and formwork panels; metal formwork beams, anchors and ties for use in the concrete construction industry; roof and ceiling beams of metal, constituent parts of roof and ceiling beams of metal; metal bolts, metal blocking wedges, metal anchoring brackets, metal framing brackets, metal framed formwork, interchangeable metal hooks for framed formwork, all for use in formwork scaffolding in the concrete construction industry; metal formwork tables; load-bearing towers and stair towers for use in the concrete construction industry made of metal; hardware namely, wall bolts of steel for formwork elements; couplings, couplings of steel for formwork elements, scaffolding metal brackets, anchoring metal nuts, form metal ties, interlocking metal cones all for use in formwork; retaining metal pillars for use in formworks; automatic metal grapplers for use in formwork; metal brackets for use in the climbing technique for formwork, metal climbing formwork, metal dam formworkACTIVEJan 5, 2018

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 26, 2026ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Nov 1, 2023NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Nov 1, 2023C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Nov 1, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 3, 2023E815TEAS SECTION 8 & 15 RECEIVED—
Mar 27, 2023REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Mar 27, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 17, 2018SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Feb 16, 2018CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Jan 29, 2018SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jan 29, 2018AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jan 16, 2018IUAFUSE AMENDMENT FILED—
Jan 16, 2018EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Dec 26, 2017NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Oct 31, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 31, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 11, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 20, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 19, 2017XAECEXAMINER'S AMENDMENT ENTERED—
Sep 19, 2017ALIEASSIGNED TO LIE—
Sep 19, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 19, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 19, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 30, 2017GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Aug 30, 2017GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Aug 30, 2017CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Aug 24, 2017DOCKASSIGNED TO EXAMINER—
Jun 1, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 29, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance