USPTO serial 87488922
SYNDEM
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Aug 21, 2018
- Examiner
- RINKER, ANTHONY MICHAEL
- Law office
- Historical data usage
What this means
Status 701 means the registration is active and the first Section 8 declaration of continued use was accepted. The next major deadline is the combined Section 8 and Section 9 filing at the 10-year anniversary. Calendar the 10-year Section 8 and 9 combined renewal.
Need help with SYNDEM?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Willowbrook, IL
Willowbrook, IL
Willowbrook, IL
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Converters; Converters for electric plugs; Converters, electric; Electric and electronic circuits; Electrical controllers; Electronic controller to manage the power, movement and functions of an elevator; Electronic controllers for use with power converters; Electronic controllers used to reduce power consumption; Electronic power supplies for driving electric motors; Electronic signaling mechanism, namely, a train control system used in the railway industry for detecting and controlling trains, ground faults, broken rails, power failures, track switches and lights; Frequency stabilizers; Power supply connectors and adaptors for use with portable electronic devices; Renewable battery system to provide backup power; Access control and alarm monitoring systems; Analog to digital converter (ADCs); Analogue to digital converters; Apparatus for converting thermal energy to electrical energy, namely, thermoelectric converters; Automated process control system comprised of logic based hardware used to monitor the status of industrial machinery, namely, turbines, generators and compressors; Automated process control system, namely, micro-processor based hardware and software used to monitor the status of industrial machinery, namely, turbines, generators and compressors; Automated process control system, namely, micro-processor based hardware and software used to monitor the status of industrial processes, namely, power generation, electrical distribution and oil and gas processing; Climate control systems consisting of digital thermostats, air conditioning, heating, ventilation and drying control devices; Consumer electronic products, namely, audio amplifiers, audio speakers, audio receivers, electrical audio and speaker cables and connectors, audio decoders, video decoders, speakers, power conversion devices, power converters, and power inverters; Current converters; DC/AC power converters; Digital to analog converters (DACs); Digital to analogue converters; Direct current converters; Electric converters; Electric power converters; Electronic control systems for engines; Electronic control systems for machines; Electronic access control systems for interlocking doors; Electronic currency converters; Electronic frequency converters for high velocity electro motors; Elevator performance monitoring system, namely, embedded software in controllers for monitoring elevator functions; Facilities management software, namely, software to control building environment, access and security systems; Frequency converter for actuators; Frequency converters; Home and office electrical power automation systems comprising wireless and wired controllers, controlled devices, and software for appliances, lighting, HVAC, security and other home and office electrical power monitoring and control applications; Occupancy sensors, namely, electronic devices which detect the presence of occupants and control the lighting system accordingly; Pulse generators for testing electric current; Rotary converters; Thin-film solar (TFS), vertical axis wind turbine (VAWT) and Hybrid TFS VAWT off-grid power and deep cycle battery storage systems composed of batteries, charge controllers and inverters with integrated LED bulbs and LED light fixtures; Turbine control systems comprising electronic sensors and related software | ACTIVE | Jun 8, 2018 |
| 042 | Consultation in the field of gas turbine and combustion engine design; Consulting in the field of engineering; Consulting services in the field of designing engines to be more efficient; Electronic and electrical systems design services; Consulting services in the field of home automation; Design of solar photovoltaic systems; Research in the field of renewable energy; Technical consultation in the field of power plant engineering, namely, testing and evaluation of power plant equipment to improve performance and efficiency of such equipment | ACTIVE | Jun 14, 2017 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 25, 2025 | NAS8 | NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED | — |
| Mar 25, 2025 | 8.OK | REGISTERED - SEC. 8 (6-YR) ACCEPTED | The USPTO accepted your Section 8 declaration showing the mark is still in use in commerce (or excusable nonuse). This satisfies the six-year maintenance requirement and keeps the registration active until the next renewal deadline. |
| Mar 25, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 17, 2024 | ES8R | TEAS SECTION 8 RECEIVED | — |
| Aug 21, 2023 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Aug 21, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 17, 2018 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jul 16, 2018 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jun 29, 2018 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jun 29, 2018 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jun 9, 2018 | IUAF | USE AMENDMENT FILED | — |
| Jun 9, 2018 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Dec 19, 2017 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Oct 24, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 24, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 4, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 14, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 13, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 22, 2017 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Jun 21, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 17, 2017 | NWAP | NEW APPLICATION ENTERED | — |