Drawing for DC DASHIELL CORP.

USPTO serial 87493432

DC DASHIELL CORP.

Reviewed by CopyMark Law Group

Reg. 5323950Status 702Renewal
Filing date
Status date
Registration date
Oct 31, 2017
Examiner
CIANCI, RYAN MICHAEL
Law office
TMO LAW OFFICE 116

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with DC DASHIELL CORP.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $748*

Plus Government fees of $1,300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mark Oathout

Mark Oathout OATHOUT LAW FIRM3701 KIRBY DRIVESUITE 960HOUSTON, TX 77098

Goods and services

ClassDescriptionStatusFirst use
037construction and maintenance of extra high, high and medium voltage electrical substations and overhead power transmission lines; infrastructure development, namely, installation of power cable, electrical apparatus, namely, high, medium, and low voltage switchgear, power transformers, protective relays, supervisory control and data acquisition control system, station batteries, power line carriers, electric motors, and capacitor banks; construction of foundations for installation of large-scale, high-voltage transmission lines, namely, drilling footings, excavation, wet-process or case concrete pier installations; construction of structures for installation of large-scale, high-voltage transmission lines, namely, setting steel poles, and construction of lattice towers; installation of conductors for large-scale, high-voltage transmission linesACTIVEDec 31, 1977
042design and testing of extra high, high and medium voltage electrical substations and overhead power transmission linesACTIVEDec 31, 1977

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 1, 2026REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Apr 29, 2024NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Apr 29, 2024C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Apr 29, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 30, 2023E815TEAS SECTION 8 & 15 RECEIVED—
Oct 31, 2022REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Oct 31, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 15, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 15, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 26, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 5, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 4, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 3, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 3, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 3, 2017CEPECOMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED—
Jul 3, 2017ALIEASSIGNED TO LIE—
Jul 3, 2017GEANNOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Jul 3, 2017GEAPEXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Jul 3, 2017CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED—
Jun 30, 2017DOCKASSIGNED TO EXAMINER—
Jun 24, 2017MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jun 23, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 20, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance