Drawing for BRAND INDUSTRIAL SERVICES

USPTO serial 87500928

BRAND INDUSTRIAL SERVICES

Reviewed by CopyMark Law Group

Reg. 6222201Status 700Renewal
Filing date
Status date
Registration date
Dec 15, 2020
Examiner
DERBY, KAREN SHEREE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with BRAND INDUSTRIAL SERVICES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*

Plus Government fees of $975

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Katherine P. Califa

Katherine P. Califa Foley & Lardner LLP3000 K Street, N.W. Suite 600Washington, DC 20007-5109United States

Goods and services

ClassDescriptionStatusFirst use
037General construction contracting; mechanical contractor services; installation of building scaffolds, working platforms, and building platforms; repair and maintenance of building scaffolds, working platforms, and building platforms; leasing, rental, assembly, erection, and dismantling services for scaffolding, suspended access systems, and structural support devices; painting; painting and applying coatings to industrial and commercial buildings and structures; painting and applying coatings to industrial machinery; application of coatings and sealers; contractor services, namely, applying corrosion protective coating to concrete, steel-in-concrete, steel, coated steel, cast/ductile iron, copper, pipelines, tanks, process equipment, reservoirs, refineries, sewers, bridges, appurtenances, transit systems, marine facilities, utility lines, substations, and service arteries, and buildings and structures in the nature of condominiums, balconies, parking decks, and major institutional centers; contractor services, namely, application of protective coatings for preventing corrosion under insulation in petrochemical facilities and chemical plants; construction services, namely, installation and application of fire retardant and resistant protective coatings, materials, insulation, and cementitious materials to buildings and structures for fireproofing; contractor services, namely, application of protective thermal spray coatings; covering, coating, and maintenance of pipelines for oil; repairing corrosive or leaking pipes through pipelining, namely, coating the inside of the pipe with a durable safe epoxy; installation, maintenance, and repair of protective coatings for floors; construction services in the field of application of paint, coatings, and resins, namely, specialized industrial painting contractor services and application of specialized coatings and resin sealers for large-scale industrial site surface preparations, oilfield, gas, shipyard and marine facilities; contractor services in the field of application of paint, coatings, and resins, namely, application of coatings, paint, and resin sealers to marine vessels, hull surfaces, above ground storage tanks, and drilling equipment and risers located on marine equipment; installation of building insulation; installation of cladding on buildings, equipment, and piping; installation of insulation, cladding, and jacketing for boilers, ducting, and piping at refinery, petrochemical and power generation facilities, and marine and offshore facilities; construction services in the field of industrial facilities insulation services, namely, installation, maintenance, and removal of thermal and cryogenic insulating materials at refinery, petrochemical and power-generation facilities, and marine and off-shore facilities; construction services in the field of refractory services, namely, installation, repair, maintenance, and demolition of refractory linings in high temperature vessels, particularly fluid catalytic cracking units, reformers, hydro crackers, crude units, thermal reactors, boilers, sulfur recovery units, and industrial furnaces; removal of rust, paint, and resins from industrial structures and equipment; power washing services in the nature of hydro blastingACTIVEJan 15, 2018
040Abrasive blasting services, namely, bead blasting, bristle blasting, robotic sand blasting, sand blasting, and wheel blasting for large-scale industrial facilities, refinery, petrochemical and power-generation facilities, and marine and offshore facilities; sandblasting services; micro-abrasive blasting services; wet abrasive blasting services; dry ice blasting services; custom manufacture of refractory anchors for refractory linings for high-temperature industrial vesselsACTIVEJan 15, 2018
042Inspection services, namely, detection of leaks in buildings and pipes for corrosion under insulation; inspection of petrochemical facilities and chemical plants for corrosion under insulationACTIVEJan 15, 2018

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 15, 2025REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Sep 13, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 13, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 13, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 13, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Sep 13, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Aug 16, 2023ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Apr 18, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 18, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 18, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 18, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 18, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Dec 15, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 10, 2020SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Nov 7, 2020CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Oct 30, 2020SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Oct 28, 2020IUAFUSE AMENDMENT FILED—
Oct 28, 2020EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jun 6, 2020EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 5, 2020EX3GSOU EXTENSION 3 GRANTED—
Jun 3, 2020EXT3SOU EXTENSION 3 FILED—
Jun 3, 2020EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 7, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 6, 2019EX2GSOU EXTENSION 2 GRANTED—
Dec 6, 2019AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Dec 4, 2019EXT2SOU EXTENSION 2 FILED—
Dec 4, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 1, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 30, 2019EX1GSOU EXTENSION 1 GRANTED—
May 30, 2019EXT1SOU EXTENSION 1 FILED—
May 30, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 4, 2018NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Oct 9, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 9, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 19, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 4, 2018PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 25, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 24, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Aug 24, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 24, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 24, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 23, 2018ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Aug 21, 2018PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Aug 6, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 2, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Aug 2, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 2, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 2, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
May 17, 2018GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
May 17, 2018GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 17, 2018CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 11, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 11, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 11, 2018ALIEASSIGNED TO LIE—
Mar 29, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 3, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 3, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 3, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 20, 2017DOCKASSIGNED TO EXAMINER—
Jun 30, 2017MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jun 29, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 26, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance