Drawing for KINETROL BLUELINE

USPTO serial 87501390

KINETROL BLUELINE

Reviewed by CopyMark Law Group

Reg. 5442354Status 702Registered
Filing date
Status date
Registration date
Apr 10, 2018
Examiner
LEE, YATSYE ISADORA
Law office
Historical data usage

What this means

Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with KINETROL BLUELINE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Robert M. O'Connell, Jr.

Robert M. O'Connell, Jr. Nutter, McClennen & Fish, LLP155 Seaport BoulevardSeaport WestBoston, MA 02210

Goods and services

ClassDescriptionStatusFirst use
007rotary actuators; pneumatic actuators; [ dashpots as parts of machines; rotary dashpots; vane dashpots; continuous rotation dashpots; ventilation dampers as parts of machines; automatic door operating equipment, namely, hydraulically operated door openers; drive adaptors for machines; air, gas and liquid flow control dampers for machines; torque convertors being parts of machines; ] positioners being parts of machines; electropneumatic positioners being parts of machines; pneumatic positioners being parts of machines; limit switches being parts of machines; [ serrated drives for machines; ] spring return units being parts of machines; [ rotary dampers being parts of machines; vibration dampers for machines; dampers for wire, paper, film and textile handling equipment, for control of descent equipment, for control of curtains and shutters, for controlling oscillation of pendulums and gimbals, for controlling jerk in camera and simulators systems, and for controlling vibration in machinery; mechanical switches being parts of machines; ] clock springs being parts of machinery; clock springs being parts of machines for control or actuation of hydraulic, pneumatic and electrical equipment [ ; rack-and-pinion units being parts of machines; anti-vibration mountings being parts of machines; control-of-descent equipment being parts of machines; roller tensioners being parts of machines; drives for take-up reel equipment being parts of machines; carriage end stop dampers being parts of machines; indexing table dampers being parts of machines; turnstile equipment dampers being parts of machines ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 3, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 3, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 3, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 4, 2024NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Oct 4, 2024C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Oct 4, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 4, 2024E815TEAS SECTION 8 & 15 RECEIVED—
Apr 10, 2023REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
May 8, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 10, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 23, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 23, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 3, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 12, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 12, 2017XAECEXAMINER'S AMENDMENT ENTERED—
Dec 12, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 12, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 12, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 25, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 25, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 25, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 20, 2017DOCKASSIGNED TO EXAMINER—
Sep 20, 2017AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Sep 19, 2017ALIEASSIGNED TO LIE—
Sep 12, 2017PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Jun 30, 2017MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jun 29, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 26, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance