Drawing for E-F@CTORY

USPTO serial 87502917

E-F@CTORY

Reviewed by CopyMark Law Group

Reg. 5652437Status 710
Filing date
Status date
Registration date
Jan 15, 2019
Examiner
ADEMI, XHENETA
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with E-F@CTORY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Perla M. Kuhn

PERLA M. KUHN FOX ROTHSCHILD LLP997 LENOX DRIVE, BUILDING 3PRINCETON PIKE CORPORATE CENTERLAWRENCEVILLE, NJ 08648-2311

Goods and services

ClassDescriptionStatusFirst use
007Electric motors other than for land vehicles; metal working machines; industrial robots; elevators; escalatorsSECTION 8 - CANCELLED—
009Computers; computer servers; computer software for use in monitoring and diagnosing machines and equipment for factory automation; computer software for use in the network communications in the automated factory; computer software for sharing of data and information in the field of factory automation; computer software for use in electricity control of machines for energy saving; interfaces for computers; data processing apparatus; electromagnetic measuring detectors; motion detectors; electric control panel; electric current switches; electric installations for the remote control of industrial operations; electric transformers; circuit breakers; inverters; electrical controlling devices; microcontrollers; amplifiers for servo motors; watt hour meters; video surveillance cameras; LCDs; LCD large-screen displays; wireless transmitters and receivers; programmable logic controllers; programmable electronic display apparatus, namely, programmable liquid crystal display (LCD) monitors; network communication apparatus, namely, devices for transporting and aggregating voice, data and video communications across multiple network infrastructures and communications protocolsSECTION 8 - CANCELLED—
011Lighting installations; electric lamps; air conditioning apparatus; air conditioning installations; heating installations; air cooling apparatus; refrigerating machines; refrigerators; refrigerating appliances and installations; air purifying apparatus; humidifiers; electric fans; ventilation apparatus, namely, ventilating fans for industrial purposes; heat pumpsSECTION 8 - CANCELLED—
037Maintenance and repair of metal working machines; maintenance and repair of electronic communication machines and apparatus other than telephones and radio and television receivers; maintenance and repair of computers; maintenance and repair of electricity distribution and control machinesSECTION 8 - CANCELLED—
042Cloud computing featuring software for use in factory automation; cloud computing featuring software for use in sharing data, creating data visualizations, data processing, and analyzing data; maintenance of computer software; upgrading of computer software; design and writing of computer software; application service provider (ASP) featuring software for use in factory automation; providing temporary use of non-downloadable computer software for use in factory automation; consultancy in the field of energy-saving, namely, consulting services in the field of energy measurement to improve energy efficiency; information technology consultancy; consultancy relating to technical and scientific analysis in the field of factory automation; consultancy and providing information in the field of industrial design and design of manufacturing apparatus; consultancy in the field of energy-saving, namely, consulting services in the field of energy measurement to improve energy efficiency based on investigation and analysis for operational status of machines, apparatus and instrumentsSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 25, 2025C8..CANCELLED SEC. 8 (6-YR)—
Jan 15, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jan 15, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 30, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 30, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 10, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 18, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 17, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 17, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 14, 2018ALIEASSIGNED TO LIE—
Sep 5, 2018ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Mar 14, 2018GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Mar 14, 2018GNSLLETTER OF SUSPENSION E-MAILED—
Mar 14, 2018CNSLSUSPENSION LETTER WRITTEN—
Mar 9, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 8, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 8, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 12, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 12, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 12, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 11, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 11, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 11, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 6, 2017DOCKASSIGNED TO EXAMINER—
Jun 30, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 27, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance