USPTO serial 87528637
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Felicia J. Boyd
Felicia J. Boyd Norton Rose Fulbright US LLP98 San Jacinto Blvd., Suite 1100Austin, TX 78701United States| Class | Description | Status | First use |
|---|---|---|---|
| 035 | Business consultation and advisory services in the fields of capital infrastructure, project planning, value engineering, costs details, risk management, and schedule analysis | SECTION 8 - CANCELLED | — |
| 037 | Asbestos removal; Building demolition; Construction and construction management of tunnels and underground structures; Construction and renovation of buildings; Construction and repair of buildings; Construction dewatering, namely, the removal of surface waters and groundwater to facilitate the construction of structures and pipelines; Construction management; Construction of airports; Construction of slurry wall and concrete structures; Consulting services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Custom construction and building renovation; Excavation services; Foundation contractor services; Hazardous waste disposal services; House and building demolition; Installation of vehicular and pedestrian bridges; Installation of slurry wall; Installation, maintenance and repair of bridges and tunnels; Maintenance and repair of bridges and tunnels; Marine construction; Paving contractor services; Pier construction; Repair and maintenance of buildings in case of demolition; Repair or maintenance of nuclear power plants; Repair or maintenance of water pollution control equipment; Residential and commercial building construction; Road construction; Road paving; Scaffolding, earthworks or concrete construction; Snow removal services; Soil erosion control services; Solid waste landfill services; Steel structure construction works; Street construction; Technical support services, namely, technical advice related to the installation of bridges and tunnels; Underwater dredging; Waste disposal for others | SECTION 8 - CANCELLED | — |
| 039 | Hazardous waste disposal services in the nature of removal or transport services; Waste disposal for others in the nature of removal or transport services | SECTION 8 - CANCELLED | — |
| 042 | Development and engineering services in the fields of ports, waste management, infrastructure, and civil construction | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 9, 2024 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Oct 18, 2023 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Oct 18, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 18, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 18, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 18, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Oct 18, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Feb 27, 2023 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Nov 21, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 21, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 27, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 12, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 12, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 28, 2017 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 28, 2017 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 22, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 30, 2017 | ALIE | ASSIGNED TO LIE | — |
| Oct 19, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 18, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 18, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 18, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 18, 2017 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Oct 13, 2017 | GEAN | NOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Oct 13, 2017 | GEAP | EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Oct 13, 2017 | EPEN | COMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION AUTOMATIC ENTRY | — |
| Oct 13, 2017 | CPEA | EXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED | — |
| Oct 13, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 21, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 18, 2017 | NWAP | NEW APPLICATION ENTERED | — |