Drawing for HUBJECT

USPTO serial 87540066

HUBJECT

Reviewed by CopyMark Law Group

Reg. 5568301Status 705Registered
Filing date
Status date
Registration date
Sep 25, 2018
Examiner
ANDERSON, CASSONDRA CR
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights. Track next renewal deadlines in TSDR and WIPO records.

Status 705: Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights.

Need help with HUBJECT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Joseph F. Schmidt

Joseph F. Schmidt TAFT STETTINIUS & HOLLISTER LLP111 E. WACKER DR., STE. 2600CHICAGO, IL 60601United States

Goods and services

ClassDescriptionStatusFirst use
007[ Automatic vending machines ]SECTION 8 - CANCELLED—
009[ Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; Electric and Electrotechnical apparatus, namely, batteries, Chargers for electric batteries and electric accumulators, Electric cables, Transformers, electricity indicators, electrical connectors, Junction boxes, Electric junction boxes, electricity limiters, electric measuring devices, namely, voltmeters and clamp meters for measuring electricity; Mechanisms for coin-operated apparatus; Electricity meters; Data-processing equipment and computers; ] Computer software featuring platforms for EV charging networks connecting electric mobility providers, EV charging network operators and EV manufacturers for the real-time exchange of information and data for EV drivers to find and access charging stations; Downloadable electronic publications in the nature of newsletters in the field of EV charging networks; [ Data memories, namely, blank magnetic hard discs and magnetic tapes, solid state drives, electronic memories; magnetic tape drives; digital versatile discs, compact discs, floppy discs for computers, and optical discs featuring information and data for EV networks and EV charging stations; blank recordable digital versatile discs; blank compact discs; blank floppy computer discs; Blank recordable optical discs; Blank tapes for storage of computer data; Blank digital storage media; computer storage devices, namely, blank flash drives; Blank electronic storage media; Blank tapes for storage of computer data; Blank magnetic tapes for tape recorders ]ACTIVE—
012[ Vehicles, in particular electronically powered motor vehicles; Motors and engines for land vehicles, in particular electric motors ]SECTION 8 - CANCELLED—
035[ Advertising; Business management; ] Marketing and promotional services, Public relations, Business consultancy and advisory services, Business consultancy; Technical consultancy in the field of energy procurement; [ Arranging of contracts with electricity suppliers; Arranging of contracts, for others, for the buying and selling of vehicles, ] Invoicing services, Bookkeeping, Systematization of data in computer databasesACTIVE—
038[ Telecommunications, namely, telecommunications gateway services and telecommunications consultation ]SECTION 8 - CANCELLED—
039[ Electricity distribution; distribution and transmission of electricity; Technical consultancy in the field of supplying thermal energy and transporting energy; Vehicle-rental services; Rental of storage areas, garages and parking places for vehicles; Vehicle towing ]SECTION 8 - CANCELLED—
040[ Generation of energy; Production of electricity ]SECTION 8 - CANCELLED—
042[ Technical infrastructure planning, namely, planning of buildings and infrastructure systems for buildings; ] technology planning in the field of electricity; Engineering services; Design and development of computer [ hardware and ] software; Installation and maintenance of software; Computer programmingACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 26, 2025NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jun 26, 2025C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jun 26, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 28, 2025E815TEAS SECTION 8 & 15 RECEIVED—
Sep 25, 2023REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Sep 25, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 10, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 10, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 20, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 20, 2018DOCKASSIGNED TO EXAMINER—
Jun 5, 2018PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 1, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 9, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 9, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 9, 2018ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Apr 25, 2018GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Apr 25, 2018GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 25, 2018CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 30, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 30, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 29, 2018ALIEASSIGNED TO LIE—
Mar 15, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 15, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 31, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 31, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 31, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 23, 2017DOCKASSIGNED TO EXAMINER—
Jul 28, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 27, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance