USPTO serial 87545130
BUILDING-TO-BATTERY-TO-GRID
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- —
- Examiner
- RICHARDSON, JENNIFER D
- Law office
- TMO LAW OFFICE 113 - EXAMINING ATTORNEY ASSIGNED
What this means
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
Need help with BUILDING-TO-BATTERY-TO-GRID?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
San Antonio, TX
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Computer hardware and software system for remotely monitoring environmental conditions and controlling devices within a building, facility, grounds, or designated spatial area; Computer hardware and software systems for energy usage management and energy efficiency optimization within buildings, facilities, grounds, power plants, grids, micro-grids, or designated spatial areas; Computer hardware and software systems for monitoring, diagnosing, optimizing, managing, and predicting energy usage, energy generation, energy storage, energy efficiency, and energy distribution within buildings, facilities, power plants, grids, or micro-grids; Electric control devices for energy usage management and energy efficiency optimization within buildings, facilities, grounds, power plants, grids, micro-grids, or designated spatial areas; Electric control devices for monitoring, diagnosing, optimizing, managing, and predicting energy usage, energy generation, energy storage, energy efficiency, and energy distribution within buildings, facilities, power plants, grids, or micro-grids; Electrical controllers; Electrical controlling devices; Data access port for use with electrical control panels for connecting multiple data and electrical devices; Electric control devices for heating and energy management; Electricity router for managing and optimizing energy loads within a building; Home and office electrical power automation systems comprising wireless and wired controllers, controlled devices, and software for appliances, lighting, HVAC, security and other home and office electrical power monitoring and control applications; Microcontrollers for internet of things (IoT) enabled devices; Power access port for use with electrical control panels for connecting multiple data and electrical devices | ACTIVE | — |
| 035 | Energy management services, namely, providing a service that allows customers to purchase energy from various energy providers; Energy management services, namely, providing a service that allows customers to purchase energy, namely, electricity, natural gas and renewable energy, at a fixed price; Energy usage management; Energy usage management information services; Assistance and consultancy services in the field of business management of companies in the energy sector; Assistance, advisory services and consultancy with regard to business planning, business analysis, business management, and business organization relating to micro credits, micro finance and energy products; Consulting services in the field of energy usage management and energy efficiency; Home energy assessment services for the purpose of determining energy efficiency or usage management; Utility bill management services, namely, tracking, reporting, analyzing and delivering energy information in the form of utility bills and utility meter data rate schedules | ACTIVE | — |
| 037 | Construction project management services in the field of construction of renewable energy and energy generation equipment support structures and ancillary structures for supporting meteorological data gathering equipment; Installation, repair and replacement of energy and electricity-generating equipment, renewable energy generation, energy storage, battery energy storage system; Installation, repair and replacement of building energy and electricity generation, storage, and distribution; Plant construction, maintenance and construction project management services for businesses in the energy production and transmission sector | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 6, 2018 | UNDN | UNDELIVERABLE MAIL - NO ACTION TAKEN | — |
| Jun 11, 2018 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jun 9, 2018 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Nov 3, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 3, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 3, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 27, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 1, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 31, 2017 | NWAP | NEW APPLICATION ENTERED | — |