USPTO serial 87554340
MAIN-LAND DEVELOPMENT CONSULTANTS, INC.
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- May 22, 2018
- Examiner
- O'BRIEN, JENNIFER LYNN
- Law office
- TMO LAW OFFICE 120
What this means
Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.
Need help with MAIN-LAND DEVELOPMENT CONSULTANTS, INC.?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Main-Land Development Consultants, Inc.
Livermore Falls, ME
Other trademarks owned by Main-Land Development Consultants, Inc.
Main-Land Development Consultants, Inc.
Livermore Falls, ME
Other trademarks owned by Main-Land Development Consultants, Inc.
Main-Land Development Consultants, Inc.
Livermore Falls, ME
Other trademarks owned by Main-Land Development Consultants, Inc.
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Theodore A. Small
Theodore A. Small SKELTON, TAINTOR & ABBOTT, P.A.500 Canal StreetLewiston, ME 04240UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 042 | Aerial surveying services; Engineering; Engineering and habitat restoration design services in the field of wetland preservation; Engineering and hydrological design of restoration of stream channels, marshes, estuaries, and wetlands; Engineering design services; Engineering services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Engineering services in the field of environmental compliance; Engineering services in the field of engineering, surveying, mapping, soil testing, planning and permitting; Engineering services, namely, engineering for the road design, stormwater control, site and soil, retaining wall, erosion and sediment; Engineering surveying; Geological estimations and research; Soil percolation testing; Soil sampling for analysis purposes; Surveying; Surveying and engineering; Agricultural testing to assist landowner with soil nutrients, hydrology, carrying capacity and classification for land owners to help understand, develop and protect land; Analysis of stream water quality; Conducting geological surveys; Consulting services in the field of environmental assessment and planning; Custom design and engineering of road, stormwater control, site and soil, retaining wall, erosion and sediment; Design of geological surveys; Design of land surveys; Drafting of plans and engineering drawings for others; Environmental testing and inspection services; Environmental engineering, testing and inspection services; Environmental services, namely, design for others in the field of environmental engineering; Environmental services, namely, technical consultation in the field of environmental science, engineering services and design for others in the field of environmental engineering; Geological surveying; Geological surveys and research; Hydrologic and engineering modeling and design of measures to protect areas likely to be inundated by storm-water and flood-waters; Land surveying; Land and road surveying; Land title surveying; Land use planning services; Marine, aerial and land surveying; Monitoring of erosion and sedimentation; Monitoring of stream water quality; Professional consulting services in the fields of engineering, land use planning, surveying, landscape architecture, and environmental sciences; Remote measuring services for the exterior features of homes, roofs and other structures to perform visual quality studies and site line determination using aerial imagery and computer software; Technology consultation and research in the field of engineering, surveying, mapping, soil testing, planning and permitting; Technology consultation in the field of engineering, surveying, mapping, soil testing, planning and permitting; Topographic surveying; Wetland habitat development and preservation services, namely, monitoring, testing and analyzing ecological success in the field of environmentally sensitive habitat conservation and preservation of native plants and wildlife | ACTIVE | Apr 15, 1976 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Main-Land Development Consultants, Inc.
- Other trademarks owned by Main-Land Development Consultants, Inc.
- Other trademarks owned by Main-Land Development Consultants, Inc.
- Other trademarks in Class 042
- Similar marks named MAIN-LAND DEVELOPMENT CONSULTANTS, INC.
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 6, 2024 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jan 6, 2024 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jan 6, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 11, 2023 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| May 22, 2023 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Mar 22, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 22, 2022 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Mar 22, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 22, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| May 22, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 6, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 6, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 14, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 28, 2018 | ALIE | ASSIGNED TO LIE | — |
| Jan 18, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 10, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 10, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jan 10, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jan 10, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 13, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 13, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 13, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 6, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 8, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 7, 2017 | NWAP | NEW APPLICATION ENTERED | — |