Drawing for BBM-CPG

USPTO serial 87558125

BBM-CPG

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
ROSEN, AMANDA
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with BBM-CPG?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Matthew A. Homyk

MATTHEW A. HOMYK BLANK ROME LLPONE LOGAN SQUARE8th FloorPHILADELPHIA, PA 19103

Goods and services

ClassDescriptionStatusFirst use
006items, fasteners, and fittings of metal hardware, namely, nuts, screws, wire rope fittings in the nature of threaded studs, bolts, and pins in the nature of metal ball lock pins, metal cotter pins, reinforcing pins for formwork, and white metal pins; metal tubing, metal pipes, and fittings therefor, namely, stuffing tubes and hull connectors; metal washers and nuts for use in packing assemblies; hardware in the nature of metal washers; metal washers, namely, spacers for maintaining alignment of connecting parts; metal nuts, namely, plugs; metal screw rings, ring-shaped fittings of metal, metal expanding sleeves for affixing screws, and rods of metal for welding and brazing, all for use in manufacture; metal fasteners for use with metal guide keys for locks; metal doors and metal door panels for turbine enclosures; prefabricated fabricated metal buildings to house electrical power and control equipment; ventilating ducts of metal, namely, air duct plenums; none of the foregoing for use in connection with aircraft or aerospace partsACTIVE—
007component parts of gas turbine engines not for land vehicles, namely, enclosures; gas filters for large silencers for use with gas turbine electrical power generators; inlet air filters for engines, namely, gas turbine engines; inlet and exhaust silencing units for gas turbine engines; machine and motor parts, namely, magnetic coupling seals; component parts of gas turbine engines not for land vehicles, namely, coupling covers; replacement parts of gas turbine engines not for land vehicles, namely, coupling covers; component parts of gas turbine engines not for land vehicles, namely, coupling guards; replacement parts of gas turbine engines not for land vehicles, namely, coupling guards; structural parts for power generation gas turbine engines not for land vehicles, namely, exhaust and silencing systems comprising free-standing or structurally supported exhaust stacks and silencer baffles and panels, inlet air treatment systems comprising filter houses, filter modules and cartridges, fog cooling systems comprising tubing arrays and nozzles for distributing water under high pressure for cooling inlet air, duct isolation systems comprising flap and guillotine type isolators, louvre dampers and diverter dampers; accessories in the nature of component parts of gas-operated turbine power generators, namely, fluid systems comprising bases, pumps, valves, fans piping, and controls; accessories in the nature of component parts of internal combustion engines for power generation, namely, fluid systems comprising bases, pumps, valves, fans piping, and controls; ignition exciters for turbine engines; parts of vibrating machines, namely, directional exciters, and circle exciters, magnetic exciters; component parts of gas turbine engines not for land vehicles, namely, collectors; gas turbine enclosures; machine parts, namely, vibration isolation dampers used in absorbing vibrating energy in machines; intake isolation dampers being structural parts for gas turbine engines not for land vehicle; inlet filter houses being structural parts for gas turbine engines not for land vehicles; filtration and pressurization skids being structural parts for gas turbine engines not for land vehicles; none of the foregoing for use in connection with aircraft or aerospace partsACTIVE—
011turbine ventilators; fabric air dispersion ducts for distributing and dispensing air as part of a HVAC system, namely, air duct plenums; none of the foregoing for use in connection with aircraft or aerospace partsACTIVE—
037construction and maintenance of equipment for on-site energy generation and operation for others; services in the nature of the installation and repair of steam and condensate systems for others; construction services and construction project management services in the field of construction of energy generation equipment and support structures and ancillary structures therefor; construction management services, namely, supervision of construction and renovation of facilities; maintenance of power generation systems in commercial and municipal facilities construction and installation services, namely, installation, construction, and renovation of power generating facilities for use in generating electric power; construction services, namely, construction and renovation of commercial and municipal buildings; installation, maintenance, and repair of systems for providing energy for residential, commercial, and municipal facilities; construction services, namely, the erection, assembly, construction, maintenance and repair of power generating installations, environmental technology installations, and electrical installations; building construction, namely, closure and rebuilding of enclosures and support structures for electric power generating equipment; repair, upgrading, and improvement of motors and generators to optimize energy use and efficiency; construction, servicing, maintenance and repair of data processing systems, namely, electrical control systems and computer hardware for installations, namely, power generation installations and machines used therein; repair of power generation installations, namely, improving the efficiency and performance of existing power generation installationsACTIVE—
040custom metal fabrication to the order and specification of others in the power generation industry; custom metal fabrication of specialty equipment, namely, turbine assemblies, enclosures, and component parts, to the order and specification of others in the power generation industryACTIVE—
042engineering and design services for others in the field of systems for providing energy; services in the nature of the engineering and design of steam and condensate systems for others; architectural design services; site planning, namely, engineering, building design for power generating facilities and energy production facilities; building engineering; scientific research and development; technical project planning, namely, architectural and technical design of energy production facilities in buildings; drafting of plans and engineering drawings for others, namely, drafting of plans and engineering drawings for energy production facilities; design and engineering of auxiliary components for power generation gas turbine engines, namely, exhaust and silencing systems, inlet air treatment systems, fog cooling systems, duct isolation systems, and diverter dampersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Jun 8, 2020MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Jun 8, 2020ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Aug 29, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 27, 2019EX3GSOU EXTENSION 3 GRANTED—
Aug 27, 2019EXT3SOU EXTENSION 3 FILED—
Aug 27, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 8, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Mar 6, 2019EX2GSOU EXTENSION 2 GRANTED—
Mar 6, 2019EXT2SOU EXTENSION 2 FILED—
Mar 6, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 14, 2018EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Sep 12, 2018EX1GSOU EXTENSION 1 GRANTED—
Sep 12, 2018EXT1SOU EXTENSION 1 FILED—
Sep 12, 2018EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 13, 2018NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jan 16, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 16, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 27, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 6, 2017ALIEASSIGNED TO LIE—
Nov 28, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 28, 2017XAECEXAMINER'S AMENDMENT ENTERED—
Nov 28, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 28, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 28, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 22, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 21, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 21, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 13, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 13, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 13, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 8, 2017DOCKASSIGNED TO EXAMINER—
Aug 10, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 10, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance