USPTO serial 87558127
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Matthew A. Homyk
Matthew A. Homyk BLANK ROME LLPONE LOGAN SQUARE8th FloorPHILADELPHIA, PA 19103| Class | Description | Status | First use |
|---|---|---|---|
| 006 | metal doors and metal door panels for turbine enclosures; prefabricated metal buildings to house electrical power and control equipment; ventilating ducts of metal, namely, air duct plenums | ACTIVE | — |
| 007 | Component parts of gas turbine engines not for land vehicles, namely, enclosures; inlet air filters for engines, namely, gas turbine engines; inlet and exhaust silencing units for gas turbine engines; structural parts for power generation gas turbine engines not for land vehicles, namely, exhaust and silencing systems comprising free-standing or structurally supported exhaust stacks and silencer baffles and panels, inlet air treatment systems comprising filter houses, filter modules and cartridges, fog cooling systems comprising tubing arrays and nozzles for distributing water under high pressure for cooling inlet air, duct isolation systems comprising flap and guillotine type isolators, louvre dampers and diverter dampers; machine parts, namely, flow isolation dampers used in separating flow in duct in machines; intake isolation dampers being structural parts for gas turbine engines not for land vehicles; inlet filter houses being structural parts for gas turbine engines not for land vehicles | ACTIVE | — |
| 011 | Fabric air dispersion ducts for distributing and dispensing air as part of a HVAC system, namely, air duct plenums | ACTIVE | — |
| 037 | construction services and construction project management services in the field of construction of energy generation equipment and support structures and ancillary structures therefor; construction management services, namely, supervision of construction and renovation of wind energy facilities; construction and installation services, namely, installation, construction, and renovation of power generation facilities; construction services, namely, construction and renovation of commercial and municipal buildings; building construction, namely, closure and rebuilding of enclosures and support structures for electric power generating equipment | ACTIVE | — |
| 040 | custom metal fabrication to the order and specification of others in the power generation industry; custom metal fabrication of specialty equipment, namely, turbine assemblies, enclosures, and component parts, to the order and specification of others in the power generation industry | ACTIVE | — |
| 042 | design and engineering of auxiliary components for power generation gas turbine engines, namely, exhaust and silencing systems, inlet air treatment systems, fog cooling systems, duct isolation systems, and diverter dampers | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 13, 2020 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Oct 12, 2020 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Mar 10, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 6, 2020 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Mar 6, 2020 | EXT4 | SOU EXTENSION 4 FILED | — |
| Mar 6, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 31, 2019 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 29, 2019 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Aug 29, 2019 | EXT3 | SOU EXTENSION 3 FILED | — |
| Aug 29, 2019 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 8, 2019 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 6, 2019 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Mar 6, 2019 | EXT2 | SOU EXTENSION 2 FILED | — |
| Mar 6, 2019 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Sep 7, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 5, 2018 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Sep 5, 2018 | EXT1 | SOU EXTENSION 1 FILED | — |
| Sep 5, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 6, 2018 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jan 9, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 9, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 20, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 3, 2017 | ALIE | ASSIGNED TO LIE | — |
| Nov 22, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 22, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 22, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 22, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 22, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 21, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 21, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 21, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 13, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 13, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 13, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 8, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 10, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 10, 2017 | NWAP | NEW APPLICATION ENTERED | — |