Drawing for MODULARIS

USPTO serial 87567256

MODULARIS

Reviewed by CopyMark Law Group

Reg. 5742469Status 710
Filing date
Status date
Registration date
May 7, 2019
Examiner
MCCARTHY, BRIDGET ANN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with MODULARIS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Theodore R. Remaklus

Theodore R. Remaklus Wood, Herron & Evans, L.L.P.600 Vine StreetSuite 2800Cincinnati, OH 45202

Goods and services

ClassDescriptionStatusFirst use
006Prefabricated houses of metal; metal door panels; door panels of metal; metal floor panels; ceiling boards of metal; floor boards of metal; metal structural beams; materials of metal for scaffolds; scaffolding of metal; scaffolding towers of metal; awnings of metal; building boards of metal; cladding of metal for building; cladding of metal for construction and building; linings of metal for building purposes; metal partitions for building; metal pillars for building; metal reinforcement materials for building; metal frames for building; tiles of metal for building; doors and windows of metal; metal windowsSECTION 8 - CANCELLED
017Glass wool for building insulation; metal foil for insulation; mineral fiber insulation, namely, mineral wool for use as a building insulator; foam insulation for use in building and construction, namely, expanded foam insulation; thermal insulation, namely, building insulation; fiberglass insulation; structural insulated construction panels, namely, structural insulated panels made with expanded foam cores and fiberglass reinforced plastic sheetsSECTION 8 - CANCELLED
019Non-metallic transportable houses, non-metallic transportable emergency shelters, non-metallic transportable homes, non-metallic prefabricated houses, non-metallic prefabricated houses sold as kits comprising non-metal structural panels, non-metal wall panels, non-metal floor panels, non-metal roofing panels, non-metal door panels, and non-metal windows; glass panels for building construction purposes; non-metal ceiling panels; non-metal door panel; Non-metal floors comprised primarily of plastic floor panels for houses; Non-metal roofing panels, namely, plastic roofing panels; wood paneling; boards of gypsum plaster; boards of wood; ceiling boards of wood; floor boards of wood; building materials, namely, particle boards; plywood board; roofing boards of wood; wood boards; wood pulp board for building; wood-fiber reinforced cement boards; wooden floor boards; concrete structural beams; structural timber; wooden structural beams; structural timber and engineered wood beams; manufactured housing, namely, mobile homes; scaffolding of wood; adhesive mortar for building purposes; asphalt felt for building purposes; asphalt for building purposes; nonmetal partitions for building, namely, cement partitions for buildings; concrete poles for use as building materials; concrete slabs for building; concrete walls for building; grout; insulating glass for building; insulating glass for construction purposes; laminated flat glass for building; logs used as building material; plaster for use in building; plaster used for building purposes; tempered glass for building; window panes for buildings; nonmetal partitions for building, namely, wooden partitions for building; nonmetal windows, namely, fiberglass windows; nonmetal windows, namely, plastic windows; window glass for building; wooden window frames; wooden casement windows; wood doorsSECTION 8 - CANCELLED
022Awnings of textile or synthetic materials; awnings of synthetic materials; awnings of textile; fasteners for attaching awnings, namely, all-purpose nylon straps featuring hook and loop fasteners for attaching awnings, and rubber cable ties and straps for attaching awningsSECTION 8 - CANCELLED
043Emergency shelter services, namely, providing temporary housing; providing temporary emergency shelter housing accommodationsSECTION 8 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 21, 2025C8..CANCELLED SEC. 8 (6-YR)
May 7, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Oct 10, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Oct 10, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 10, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
May 7, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 29, 2019DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION
Mar 29, 2019AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL
Mar 12, 2019IUCNNOTICE OF ALLOWANCE CANCELLED
Mar 12, 2019EPPATEAS POST PUBLICATION AMENDMENT RECEIVED
Mar 12, 2019NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jan 15, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jan 15, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 26, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Dec 11, 2018PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Dec 10, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Dec 10, 2018XAECEXAMINER'S AMENDMENT ENTERED
Dec 10, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Dec 10, 2018GNEAEXAMINERS AMENDMENT E-MAILED
Dec 10, 2018CNEAEXAMINERS AMENDMENT -WRITTEN
Nov 13, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Nov 13, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Nov 9, 2018ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED
Jul 10, 2018GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED
Jul 10, 2018GNSIINQUIRY TO SUSPENSION E-MAILED
Jul 10, 2018CNSISUSPENSION INQUIRY WRITTEN
Jan 8, 2018GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Jan 8, 2018GNSLLETTER OF SUSPENSION E-MAILED
Jan 8, 2018CNSLSUSPENSION LETTER WRITTEN
Jan 3, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jan 3, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 21, 2017ALIEASSIGNED TO LIE
Dec 13, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 17, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 17, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 17, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 16, 2017DOCKASSIGNED TO EXAMINER
Aug 18, 2017TAEATEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED
Aug 18, 2017PARITEAS VOLUNTARY AMENDMENT RECEIVED
Aug 18, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Aug 17, 2017NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance