Drawing for TOUGH-TAIN

USPTO serial 87583801

TOUGH-TAIN

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
DOMBROW, COLLEEN M
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with TOUGH-TAIN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Robert A. Goetz

Robert A. Goetz CASIMIR JONES, S.C.2275 DEMING WAY, STE 310MIDDLETON, WI 53562UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Irons and steels; nonferrous metals and their alloys; metal materials for buildings and construction, namely chimney shafts of metal, stair treads of metal, fasteners for casement windows of metal, guardrails of metal, wall linings of metal, pilings of metal, gratings of metal, tunneling materials of metal in the nature of metal pilings, fences of metal, metal shutters for building or construction, water-pipes of metal, tiles of metal, steel frames for building, boards of metal for shelves as metal materials for building or construction, hinges of metal, handrails of metal, ceiling boards of metal, gutters of metal, gutter brackets of metal, doors of metal, pillars of metal, wainscotings of metal, metal beams, fire retarding doors of metal, floor pavings of metal in the nature of metal floor supports, windows of metal, window frames of metal, gates of metal, floor boards of metal for building or construction, louver doors of metal, laths of metal, frames of metal for building and construction, solar battery module frame in the nature of metal mounts for solar batteries, metal roofing, roofing tiles of metal, roofing of metal, metal wallboards, metal tiles for walls, exterior materials of metal in the nature of sheet metal, cladding of metal, reinforcing materials of metal, wall panels of metal, floor panels of metal, roof panels of metal, metal ceiling boards for building or construction, duckboards of metal, roof purlins of metal, roof rafters of metal, sleepers of metal used for flooring support, joists of metal, braces of metal, diagonal beams of metal, girders of metal in the nature of support beams, metal hardware in the nature of metal supports for column bases, roof trusses of metal, roof gables of metal, metal plates for diagonal beams, and hold-down hardware of metal in the nature of metal threaded fasteners; metal joinery fittings; washers of metal; reinforcing materials of metal for building, material attachment components of metal, namely, metal brackets for building; stops of metal for use in connection with mounts for solar batteries; prefabricated building assembly kits of metal; reservoirs of metal; industrial packaging containers of metal; loading and unloading pallets of metal; metal molds for forming cement, namely, metal forms for use in building and construction; metal junction for pipes; metal flanges; upright sign boards of metal; containers of metal for transport; steel strip; steel sheets; steel plates; steel pipes and tubes; section steel, namely, shaped cold-finished steel bars for use in connection with frames of metal, solar battery module frame, metal components for automobiles, furring strips of metal, vinyl plastic hothouses, metal materials for building or construction, prefabricated building assembly kits of metal, metal beams, pillars of metal, steel frames for building, reinforcing materials of metal, diagonal beams of metal, girders of metal, H-steel, steel angles, channel shaped steels, and I-steel; corrugated steel plates; steel plates and sheets laminated with synthetic resin for use in injection molding; pipework of metal, excluding those related to metal materials for building or construction; common metals, unwrought or semi-wrought; water pipes and gas pipes of steel; water pipes and gas pipes of metal; signboards of metal; gaskets of metal for pipes; stainless steels; fluororesin pre-painted stainless steel; high corrosion resistance ferritic stainless steel; galvanized stainless steel; aluminum-coated stainless steelACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
May 10, 2021MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
May 10, 2021ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Aug 21, 2020EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 19, 2020EX3GSOU EXTENSION 3 GRANTED—
Aug 19, 2020EXT3SOU EXTENSION 3 FILED—
Aug 19, 2020EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 18, 2020EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Mar 17, 2020EX2GSOU EXTENSION 2 GRANTED—
Mar 17, 2020AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Mar 6, 2020EXT2SOU EXTENSION 2 FILED—
Mar 6, 2020EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 16, 2019ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Sep 10, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Sep 6, 2019EX1GSOU EXTENSION 1 GRANTED—
Sep 6, 2019EXT1SOU EXTENSION 1 FILED—
Sep 6, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 9, 2019NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Feb 12, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 12, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 23, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 2, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 21, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 21, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 21, 2018ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jun 22, 2018GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jun 22, 2018GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 22, 2018CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 31, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 30, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 30, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 2, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 2, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 2, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 30, 2017DOCKASSIGNED TO EXAMINER—
Aug 31, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 29, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance