Drawing for SEALIN

USPTO serial 87587834

SEALIN

Reviewed by CopyMark Law Group

Reg. 6521041Status 700Renewal
Filing date
Status date
Registration date
Oct 12, 2021
Examiner
BURNS, ELLEN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SEALIN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,446*

Plus Government fees of $1,300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Farzad A. Panjshiri

Farzad A. Panjshiri Cantor Colburn LLP20 Church Street | 22nd FloorHartford, CT 06103-3207United States

Goods and services

ClassDescriptionStatusFirst use
006Metal building materials, in particular, prefabricated construction elements for building installations for collecting and removing water, surface water, waste water and other liquids, for drainage installations in civil engineering, hydraulic engineering, road construction, sports field construction and building construction, channel drainage, point drainage and surface drainage, namely, drainage channels, inlet boxes and containers, intermediate containers, throttle shafts, catch basins, downspout boxes, sludge traps, prefabricated inspection chambers, floor drains with and without odour traps, covers, cover gratings, cover grilles, cover plates, manhole covers with and without perforations, dirt collection sieves and rakes, pipe and hose connections, clamps, pipe muffs, pipe caps, pipe sealing ends, wall and window feedthroughs for pipes, all of the aforesaid consisting of metal; Seepage plates of metal; Shaped parts of metal for the drainage of buildings, namely, gutters and gutter pipes; Prefabricated components of metal for aerating and ventilating installations for buildings, namely, ventilating and aerating grilles, profiles of metal for building, in particular, cover gratings and floor troughs for shoe scrapers; Window frames, prefabricated windows, awning windows and awning basement windows, all made from metal; Profiles for windows and doors of metal, namely, installation frames, awning window frames, protective grilles, decorative grilles, blind frames and casements, basement light wells with and without a light well grate, drainage connections for basement light wells; Pipes and tubes of metal in particular for civil engineering, hydraulic engineering, road building, sports ground construction and building construction; Metal drainage pipes, ventilation pipes, supply pipes and waste water pipes, in particular flexible and non-flexible pipes, telescopic pipes, ells, T-pieces, pipe bends, branching pipes, cleaning pipes, drainage conduits, drainage pipes for building; Prefabricated construction parts of metal for the construction of inspection chambers, flushing shafts and collection pits in drainage installations; Structural and replacement parts and accessories for all the aforesaid goodsACTIVEJul 29, 2021
007Machines for sewage treatment, in particular, separators for lightweight or heavy materials, namely, sediment traps, petrol separators, separators for lightweight mineral liquids, starch separators and coalescence separators; Pumping stations, comprising pumps, motors, and valves for surface water removal, sewage removal and sludge removal; Parts and accessories for the aforesaid goods, namely, prefabricated basins and containers, covers, floats, equilibrium float valves, closures, gravity barriers, sludge outlets, oil suction devices and filtersACTIVE—
017Films of plastic or viscose for building purposes, in particular, for cladding infiltration trenches; Plugs for infiltration trenches of plastic; Connecting pieces, namely, junctions, not of metal, for pipes, for connecting inlets, outlets or vents to infiltration trenches of plastic; Connecting means of plastic, namely, junctions of plastic, not of metal, for pipes of plastic, in particular for connecting infiltration trenches to one anotherACTIVEJul 29, 2021
019Construction materials consisting wholly or partly of mineral construction materials, cement concrete, plastic concrete, plastic, rubber and rubber substitutes, earthenware, porcelain, glass, mineral casting, in particular, drain bases and grates, non-metal pipes, plastic conduit for channel drainage, point drainage or surface drainage for drainage installations in civil engineering, hydraulic engineering, road construction, sports field construction and building construction; Pre-fabricated components, not of metal, for building installations for collecting and draining water, surface water, waste water and other liquids, in particular, for channel drainage, point drainage or surface drainage, namely, drainage channels, inlet boxes and containers, intermediate containers, throttle shafts, catch basins, downspout boxes, sludge traps, prefabricated inspection chambers, floor drains with and without odour traps, covers, cover gratings, cover grilles, cover plates, manhole covers with and without perforations, dirt collection sieves and rakes, wall and window feedthroughs for pipes, none of the aforesaid consisting of metal; Non-metal drainage plates; Shaped parts of plastic for the drainage of buildings, ventilating and aerating grilles, inner and outer shrouds; Non-metal frames, angle frames, covering grates and floor basins for construction of shoe cleaning installations in buildings; Non-metal components of doors, door and window frames, prefabricated windows, awning windows and awning basement windows with and without integrated roller blinds, profiles, namely, installation frames, awning window frames, protective grilles, decorative grilles, blind frames and casements, basement light wells with and without a light well grate, drainage connections for basement light wells, all of the aforesaid made from plastic and wood; Building glass for doors, windows for buildings, in particular being single glass, insulating glass and double glass panes; Doors and windows glass made of plastic or acrylic glass; Pipes, not of metal, for civil engineering, hydraulic engineering, road construction, sports field construction and building construction, drainage pipes, aeration and ventilation tubes and inlet and waste water pipes, in particular flexible and non-flexible tubes, telescopic tubes, angled tubes, T-sections for pipes, curved pipes, branching pipes, cleaning tubes, rubble drain pipes, drainage pipes for building; Non -metal prefabricated construction parts, for the construction of inspection chambers, flushing shafts and collection pits in drainage installations; Non- metal structural and replacement parts and accessories for all the aforesaid goods; Plastic infiltration trenches and components for infiltration trenches, in particular base elements and side walls for infiltration trenches of plastic, inspection manholes and manhole coverings for infiltration trenches of plastic; Stabilization fabrics, namely, geotextiles for use in construction of water retention installations, water storage installations and drainage installationsACTIVEJul 29, 2021

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 9, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 9, 2026ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Nov 9, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 9, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 9, 2026CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Nov 9, 2026COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Oct 12, 2026REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
May 20, 2026ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Apr 22, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 22, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 22, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 22, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 22, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Oct 12, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 7, 2021SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Sep 4, 2021CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Aug 5, 2021SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Aug 2, 2021IUAFUSE AMENDMENT FILED—
Aug 2, 2021EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Dec 16, 2020EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 15, 2020EX5GSOU EXTENSION 5 GRANTED—
Dec 15, 2020AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Dec 1, 2020EXT5SOU EXTENSION 5 FILED—
Dec 1, 2020EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 9, 2020EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 5, 2020EX4GSOU EXTENSION 4 GRANTED—
Jun 5, 2020EXT4SOU EXTENSION 4 FILED—
Jun 5, 2020EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 21, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 19, 2019EX3GSOU EXTENSION 3 GRANTED—
Dec 19, 2019EXT3SOU EXTENSION 3 FILED—
Dec 19, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
May 10, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 8, 2019EX2GSOU EXTENSION 2 GRANTED—
May 8, 2019EXT2SOU EXTENSION 2 FILED—
May 8, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 5, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 3, 2019EX1GSOU EXTENSION 1 GRANTED—
Jan 3, 2019EXT1SOU EXTENSION 1 FILED—
Jan 3, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 31, 2018NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jun 5, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 5, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 16, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 1, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 11, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 11, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 10, 2018ALIEASSIGNED TO LIE—
Mar 28, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 17, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 17, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 17, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 4, 2017DOCKASSIGNED TO EXAMINER—
Sep 6, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 1, 2017NWAPNEW APPLICATION ENTERED—