USPTO serial 87588048
POWERMEANS
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Mar 27, 2018
- Examiner
- RIRIE, VERNA BETH
- Law office
- TMEG LAW OFFICE 104
What this means
Status 701 means the registration is active and the first Section 8 declaration of continued use was accepted. The next major deadline is the combined Section 8 and Section 9 filing at the 10-year anniversary. Calendar the 10-year Section 8 and 9 combined renewal.
Need help with POWERMEANS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
PowerMeans Electrical Contracting Inc
Annapolis, MD
Other trademarks owned by PowerMeans Electrical Contracting Inc
PowerMeans Electrical Contracting Inc
Annapolis, MD
Other trademarks owned by PowerMeans Electrical Contracting Inc
PowerMeans Electrical Contracting Inc
Annapolis, MD
Other trademarks owned by PowerMeans Electrical Contracting Inc
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Consultation services in the field of construction of environmentally-conscious buildings; Consulting in the field of building construction; Consulting in the field of hospital construction; Electrical contractor services; Lighting apparatus installation; Lighting apparatus repair; Charging station services for electric vehicles; Comprehensive preventative maintenance service for electrical systems; Construction consultation; Contractor services, namely, review of and remedial recommendations for building plumbing, electrical and mechanical systems for others; General contractor services, namely, plumbing, heating and air conditioning, carpentry, drywall, painting, electrical, building and framing contractor services; Repair or maintenance of electric lighting apparatus; Residential and building construction consulting; Technical consultation in the field of building construction; Technical consultation in the field of installation of lighting apparatus, lighting instruments and lighting systems | ACTIVE | Jul 7, 2015 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by PowerMeans Electrical Contracting Inc
- Other trademarks owned by PowerMeans Electrical Contracting Inc
- Other trademarks owned by PowerMeans Electrical Contracting Inc
- Other trademarks in Class 037
- Similar marks named POWERMEANS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 25, 2023 | NAS8 | NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED | — |
| Aug 25, 2023 | 8.OK | REGISTERED - SEC. 8 (6-YR) ACCEPTED | The USPTO accepted your Section 8 declaration showing the mark is still in use in commerce (or excusable nonuse). This satisfies the six-year maintenance requirement and keeps the registration active until the next renewal deadline. |
| Aug 25, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 27, 2023 | ES8R | TEAS SECTION 8 RECEIVED | — |
| Mar 27, 2023 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Mar 27, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 9, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 9, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 9, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 20, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 5, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 4, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 6, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 1, 2017 | NWAP | NEW APPLICATION ENTERED | — |