Drawing for EIT

USPTO serial 87590823

EIT

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
SCHIMPF, TIMOTHY O
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with EIT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Stephanie A. Schmidt

Stephanie A. Schmidt NORTON ROSE FULBRIGHT US LLP98 San Jacinto Blvd., Suite 1100Austin, TX 78701UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
011Environmental control system for industrial applications comprised of combustion chambers, gas and electric furnaces, gas burners, incinerators, gas and electric boilers, water heaters, heat transfer fluid heaters, waste gas heat exchangers not being parts of machines, waste heat recovery units, dryers used for the removal of vapor contaminants from compressed air and gases, electric heaters and electric boilers, and also including electrical controlling devices; Heating apparatus for industrial use, namely, process tubular fired heaters, direct fired heaters, refining and petrochemical furnaces, waste heat recovery units and heat recovery units not being parts of machines; steam generating apparatus comprised of waste heat boilers for generating saturated or superheated steam for process use, cogeneration, combined cycle or other power generation cycles, industrial boilers, carbon monoxide industrial boilers, flue gas coolers, and waste heat recovery units for recovering heat from incineration, petrochemical, and refining operations; Distillation apparatus and installations not for scientific purposes sold as a unit for process distillation, comprised of atmospheric and vacuum distillation furnaces, process tubular fired heaters, and direct fired heaters; Waste heat recovery boilers and units for use in enhanced oil recovery, cyclical steam stimulation, and steam assisted gravity drainage (SAGD) applications; Heating boilers, namely, waste heat boilers for heating, fire packaged watertube boilers for heating, custom and specialty steam boilers for heating, once through steam generators, and heat recovery steam generators, for enhanced oil recovery, cyclical steam stimulation, and steam assisted gravity drainage (SAGD) applications; Waste heat recovery boilers for use in petrochemical plants and heat recovery steam generators to recover waste heat from gas turbines, all for use in producing saturated or superheated steam for process, cogeneration, combined cycle, or electric power generationACTIVE—
037Installation, maintenance, and repair of power and energy generation machinery and equipment; Consultation services in the field of installation, maintenance, and repair of power and energy generation machinery and equipment; Installation, maintenance, repair, and renovation of steam and gas turbine generators and their components and parts; Installation, maintenance, repair, and renovation of heat recovery steam generators, heat exchangers, boilers, once through steam generators and steam assisted gravity drainage (SAGD) units and their components and partsACTIVE—
040Contract manufacturing for others in the field of heat recovery steam generators, heat exchangers, boilers, once through steam generators and steam assisted gravity drainage (SAGD) units; Custom construction of heat recovery steam generators, heat exchangers, boilers, once through steam generators and steam assisted gravity drainage (SAGD) units for others; Fabrication of heat recovery steam generators, heat exchangers, boilers, once through steam generators and steam assisted gravity drainage (SAGD) units for others; Custom manufacture of combustion systems for industrial applications, vapor recovery systems and marine handling systemsACTIVE—
042Process design for others in the field of industrial heating and cooling apparatus and machinery; Custom design and engineering services in the field heat recovery steam generators, heat exchangers, boilers, once through steam generators and steam assisted gravity drainage (SAGD) units; Power and energy generation machinery and equipment inspection servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Oct 18, 2021MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Oct 18, 2021ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Mar 26, 2021EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Mar 25, 2021EX5GSOU EXTENSION 5 GRANTED—
Mar 25, 2021AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Mar 10, 2021EXT5SOU EXTENSION 5 FILED—
Mar 10, 2021EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 8, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 8, 2021EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Mar 8, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 8, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 5, 2020EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Sep 3, 2020EX4GSOU EXTENSION 4 GRANTED—
Sep 3, 2020EXT4SOU EXTENSION 4 FILED—
Sep 3, 2020EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 13, 2020EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Feb 11, 2020EX3GSOU EXTENSION 3 GRANTED—
Feb 11, 2020EXT3SOU EXTENSION 3 FILED—
Feb 11, 2020EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 10, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Sep 7, 2019EX2GSOU EXTENSION 2 GRANTED—
Sep 7, 2019EXT2SOU EXTENSION 2 FILED—
Sep 7, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 4, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 4, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 6, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Mar 4, 2019EX1GSOU EXTENSION 1 GRANTED—
Mar 4, 2019EXT1SOU EXTENSION 1 FILED—
Mar 4, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 11, 2018NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 23, 2018DOCKASSIGNED TO EXAMINER—
Jul 17, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 17, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 27, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 12, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 12, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Jun 12, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 12, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 12, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 8, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 7, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 7, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 11, 2017GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Dec 11, 2017GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Dec 11, 2017CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Dec 5, 2017DOCKASSIGNED TO EXAMINER—
Sep 8, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 2, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance