Drawing for BALFOUR BEATTY

USPTO serial 87607304

BALFOUR BEATTY

Reviewed by CopyMark Law Group

Reg. 6080509Status 700Renewal
Filing date
Status date
Registration date
Jun 16, 2020
Examiner
KHOURI, SANI PHILIPPE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with BALFOUR BEATTY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,046*

Plus Government fees of $1,700

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jonathan M. Gelchinsky

Jonathan M. Gelchinsky Pierce Atwood LLP254 Commercial StreetPortland, ME 04101UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Building construction; providing information relating to the repair of buildings; providing information relating to the repair of machines and systems for manufacturing integrated circuits; pipeline repair; roof repair; concrete repairs; building repairs; warehouse repair; supervision of building repair; consultancy services relating to the repair of buildings; machinery installation; plant installation; installation of electrical wiring, outlets, light fixtures, and electrical panels; heating equipment installation; installation of basement waterproofing products; installation of pipe systems for conducting of gases; installation of insulating materials in buildings, roofs and structures; underwater construction; installation of building insulation; building construction services; repair and maintenance of buildings; advisory services relating to the construction of public works; assembling of building framework; assembly of prefabricated houses; building demolition; building of factories; building of industrial properties; building of motorway networks; building of multi-storey car parks building of offices; building of railways; building of roads; building of schools; building of underground structures; building reinforcing; civil engineering construction; civil engineering demolition; building construction information; construction of airports; construction of carriageways; construction of civil engineering works; construction of complexes for recreational purposes; construction of drainage systems; construction of exploitation platforms; construction of floors; construction of factories; construction of foundations for roads; construction of leisure complexes; construction of nuclear power plants; construction of power plants; construction of public works; warehouse construction and repair; building of bridges; building of commercial properties; bricklaying; building construction supervision; installation of building insulation; demolition of buildings; laying of cable; machinery installation, maintenance and repair; pipeline construction and maintenance; plumbing; rental of construction equipment; rental of cranes; rental of bulldozers; rental of drainage pumps; rental of excavators; rental of building tools; rental of building machinery; rental of scaffolding; leasing of construction equipment; services for the rental of machinery for civil engineering; repair information, namely, construction repair; scaffolding erection and repair; installation, maintenance and repair of railway tracks; maintenance and repair of railway vehicles; repair and maintenance of laser measuring apparatus; construction planning; off-site building construction project management; information, consultancy and advisory services relating to the aforesaid servicesACTIVE—
041Education services, namely, conferences and workshops in the fields of construction, engineering and railways; providing of training in the fields of construction, engineering and railways; providing online electronic publications, namely, articles in the fields of construction, engineering and railways; training in the use of construction machinery; conducting of educational courses in engineering; consultancy services relating to engineering training; internships and apprenticeships in the field of construction, engineering and railways; training and education, namely, seminars in the fields of construction, engineering and railways; training services relating to health and safety; publication of educational materials in the field of construction, engineering and railways; driver training; industrial training in the fields of construction, engineering and railways; vocational training in the fields of construction, engineering and railways; information, consultancy and advisory services relating to the aforesaid servicesACTIVE—
042Industrial design; design of buildings; urban design planning services; architectural and urban planning services; advisory services relating to industrial design; design and development of engineering products; advisory services relating to design engineering; design services relating to civil engineering; architectural design; planning and design of sports facilities; planning and design of residential communities; planning and design of retail premises; engineering consultancy relating to design; engineering consultancy services; technical consultancy services relating to structural engineering; technical consultancy services relating to civil engineering; civil engineering; computer-aided engineering design and drawing services; conducting engineering surveys; design of engineered building systems; engineering research; engineering services in the field of electrical power and natural gas production; engineering services for the analysis of structures; engineering services for the design of structures; engineering project studies; engineering services relating to energy supply systems; engineering testing; preparation of reports relating to technical project studies for construction projects; architectural planning services; preparation of architectural reports; architectural services for the design of buildings; architectural services for the design of commercial buildings; providing information in the field of architectural design and construction via a website; mechanical engineering; electrical engineering; rail engineering; process engineering; geotechnical engineering; engineering; civil engineering consultancy; safety auditing to improve safety of construction workers on residential construction sites; information, consultancy and advisory services relating to the aforesaid serviceACTIVE—
045Information services relating to the safety of property and individuals, namely, safety consultation in the field of construction; advisory services in relation to the safety of property and individuals, namely, providing safety consultation in the field of construction; security services for the protection of property and individuals, namely, providing construction site surveillance; advisory services relating to the preparation of standards, namely, reviewing standards and practices to assure compliance with construction laws and regulations; safety evaluation information services relating to health and safety, namely, construction site inspection and assessment; inspection of factories for safety purposes; advisory services in relation to safety, namely, construction site inspection and assessment; safety consultation in the field of construction site inspection and assessment; security assessment of risks, namely, safety consulting services in the field of construction; licensing of franchise concepts; consultancy on regulations on safety at work; providing information in the field of building security via the Internet; control of building environmental access and security systems, namely, monitoring of security alarm systems; information, consultancy and advisory services relating to the aforesaid servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 16, 2025REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jun 16, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 15, 2020SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
May 14, 2020CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
May 7, 2020SUPCSTATEMENT OF USE PROCESSING COMPLETE—
May 7, 2020AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Apr 23, 2020EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Apr 13, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 13, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 13, 2020ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Apr 13, 2020EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Apr 13, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 13, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 13, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 9, 2020IUAFUSE AMENDMENT FILED—
Oct 11, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 9, 2019EX1GSOU EXTENSION 1 GRANTED—
Oct 9, 2019EXT1SOU EXTENSION 1 FILED—
Oct 9, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 9, 2019NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Feb 12, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 12, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 23, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 9, 2019PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 7, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 18, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 17, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 17, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 17, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 17, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 17, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 27, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 27, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 21, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 21, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 21, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 21, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 17, 2017DOCKASSIGNED TO EXAMINER—
Nov 3, 2017AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Oct 30, 2017ALIEASSIGNED TO LIE—
Oct 19, 2017PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Oct 3, 2017TAEATEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED—
Oct 3, 2017PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Sep 19, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 16, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance