Drawing for BARGE

USPTO serial 87610235

BARGE

Reviewed by CopyMark Law Group

Reg. 5740636Status 702Registered
Filing date
Status date
Registration date
Apr 30, 2019
Examiner
ALESKOW, DAVID HOWARD
Law office
Historical data usage

What this means

Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with BARGE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Robert L. Brewer

Robert L. Brewer BASS, BERRY & SIMS PLC21 Platform Way South, Suite 3500Nashville, TN 37203United States

Goods and services

ClassDescriptionStatusFirst use
037Construction planning in the areas of airports, railroads, traffic systems, water drainage systems, water treatment systems, distribution and storage systems, wastewater collection and treatment systems, industrial waste treatment systems, solid waste facilities, decontamination and decommissioning systems, hazardous and toxic waste management systems, brown field reclamation and development, HVAC systems, plumbing and process piping systems, boiler systems, fire protection systems, energy management control systems, material handling systems, power distribution systems, lighting systems, fire alarm systems, communication wiring systems, instrumentation and process control systems, foundations, bridges, retaining structures, seismic designs, and special structures, municipal, commercial, institutional, industrial, educational, and residential buildings, sites and landscapes; and construction services, namely, project representation during construction phase, third party reviews, construction progress inspections, plan reviews, physical plant analysis, and facilities evaluationACTIVEJan 1, 2018
042Civil engineering services, namely, site planning and development, grading and storm drainage, utilities, traffic studies, industrial access roadways, rail spur coordination and design, water and wastewater infrastructure design and permitting for municipal and industrial clients, master plans, and rate studies; traffic and transportation engineering, namely, interstate highways, streets, interchanges, signalization, traffic impact studies, transportation planning, public transit planning, bicycle pedestrian facility design, aviation; environmental engineering, namely, industrial waste treatment, landfill, transfer stations and other solid waste facilities, hazardous and toxic waste management, environmental assessments, brownfield development, permitting; mechanical engineering, namely, HVAC systems, plumbing and process piping, boiler systems, fire protection systems, energy management control systems, conveying systems and material handling, dust collection systems; electrical engineering, namely, high voltage electric power systems engineering, lighting, fire alarms, communications wiring, instrumentation, process controls; structural engineering, namely, building superstructure and foundations, bridges, retaining structures, seismic design, special structures, crane runway systems; architectural services, for industrial, municipal, commercial, institutional, correctional, educational, and residential buildings including facilities evaluations and historic preservation; Design services in the field of controls engineering, instrumentation, automation and controls systems including programmable logic controllers, human-machine interfaces, and supervisory control and data acquisition (SCADA); providing on-line non-downloadable geographic information system software; information management, namely, data collection, application development, remote sensing; surveying services, namely, topographic surveying, property line, construction and GPS surveys, aerial survey ground control, infrastructure inventory, high definition surveys, existing building scanning services; planning services, namely, land use and transportation plans, zoning studies, comprehensive and neighborhood plans, economic strategies and industrial development programs, grant applications, housing and community development programs; and landscape architectural services, namely, site and landscape design, recreation master plans, land developmentACTIVEJan 1, 2018

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 21, 2025NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Aug 21, 2025C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Aug 21, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 15, 2025E815TEAS SECTION 8 & 15 RECEIVED—
Jan 29, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 29, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 29, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 30, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Aug 18, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 18, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 18, 2021EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Aug 18, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 18, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 18, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 30, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 26, 2019SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Mar 25, 2019CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Mar 25, 2019SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Mar 25, 2019AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Mar 7, 2019IUAFUSE AMENDMENT FILED—
Mar 7, 2019EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Oct 23, 2018NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 28, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 28, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 8, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 18, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 18, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Jul 18, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 18, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 18, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 18, 2018ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jul 10, 2018PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jun 27, 2018ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jun 21, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 20, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 20, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 20, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 20, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 20, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 20, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 20, 2017DOCKASSIGNED TO EXAMINER—
Sep 20, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 19, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance