USPTO serial 87669676
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
København K, DK
København K, DK
København K, DK
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Barbara A. Friedman
BARBARA A. FRIEDMAN EDELL, SHAPIRO & FINNAN, LLC9801 WASHINGTONIAN BOULEVARD, SUITE 750GAITHERSBURG, MD 20878UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Advice on demolition of buildings; advice regarding renovation of buildings; consultancy in connection with construction; consultancy services in connection with construction work; supervision of building construction in connection with construction projects; supervision of building constructions in connection with property projects; building inspection in connection with construction of buildings; building of commercial real estate; construction of industrial properties; consultancy in the field of construction engineering; consultancy and information in the field of construction; advice in the field of building construction supervision; contractor services; construction project management at the workplace of a construction company; building project management at the workplace in connection with the construction of airport facilities; building project management at the workplace in connection with the construction of aerodrome facilities; providing technical information in the field of building construction; advice on the construction of real estate; construction, construction, maintenance and repair of construction engineering, mechanical engineering and electrical engineering and industrial installations and related consultancy services; construction engineering advice on construction in connection with construction projects, including construction projects and restructuring and modification of existing buildings; building engineering advice on the division of existing buildings; advice on construction and construction of real estate, including in connection with project development; renovation of buildings; advice on refurbishment of buildings; building construction services; repair of buildings; restoration of buildings; installation of doors and windows | SECTION 8 - CANCELLED | — |
| 042 | Architectural activities; architecture; architectural advice; design services relating to architectural activities; administration of architectural projects; architectural planning; interior design company; research in architecture; architectural and urban planning services; architectural design in connection with interior decoration; architectural design for outdoor decor; Professional advice regarding architectural activities; architectural and engineering activities; architectural services in the preparation of building plans; architectural development for land development projects; computer-aided design in connection with architectural activities; Architectural services in connection with design of buildings; architectural work in connection with the design of office facilities; design of shop furniture; architectural business in connection with the design of industrial buildings; architectural services in connection with the design of commercial buildings; consultancy services in the field of architecture and building plans; commercial interior design business; interior design; design of building fixtures; planning of indoor areas; interior design and building architecture; design advice regarding interior design; advice on interior design; interior design business and information and advice on this; interior decoration business for the retail industry; planning on urban planning and commercial urban planning; architectural activities in connection with urban planning; city planning advice; cadastral surveying; advisory engineering company that calculates quantities and prices for engineering design; inspection of defective constructions for engineering quality control; Inspection of buildings including retail store buildings for engineering quality assurance; Engineering advisory services for property condition assessment; Design services, namely, urban design planning services; design of furniture; art design; commercial art; industrial and graphic design; industrial art design; design of art graphics; design of handicrafts; graphic design; graphic design business; computer-aided graphic design; design of graphic illustrations; design and graphic arts design for website design; design of decorative layouts in the nature of interior design; design of layouts for offices; design of layouts for office furniture; design of layouts for furniture; design of printed matter; postcard design; design of posters; design of prints for clothing, furniture, postcards, posters; urban furnishings; design drafting and city planning counseling; landscape architectural services provided by landscape architects; drafting and advice in landscape architectural activities; consultancy services in landscape architecture | SECTION 8 - CANCELLED | — |
| 044 | Gardening activities; studies of public areas and parks in connection with landscaping and gardening; Gardening work | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 8, 2026 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Oct 22, 2024 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Oct 22, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 6, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 6, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 17, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 29, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 29, 2019 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 29, 2019 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 29, 2019 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 29, 2019 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 11, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 11, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 11, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 22, 2019 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jan 15, 2019 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Dec 31, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 31, 2018 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 31, 2018 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 31, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 29, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 29, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 29, 2018 | ALIE | ASSIGNED TO LIE | — |
| Nov 26, 2018 | NREV | NOTICE OF REVIVAL - E-MAILED | — |
| Nov 25, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 25, 2018 | PETG | PETITION TO REVIVE-GRANTED | — |
| Nov 25, 2018 | PROA | TEAS PETITION TO REVIVE RECEIVED | — |
| Sep 25, 2018 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Sep 24, 2018 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Feb 22, 2018 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 22, 2018 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 22, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 13, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 13, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 6, 2017 | NWAP | NEW APPLICATION ENTERED | — |