Drawing for ALUSALT

USPTO serial 87671623

ALUSALT

Reviewed by CopyMark Law Group

Reg. 5706910Status 710
Filing date
Status date
Registration date
Mar 26, 2019
Examiner
GANDARA, KEYLA MARIA
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ALUSALT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Timothy M. Kenny

Timothy M. Kenny Norton Rose Fulbright US LLP98 San Jacinto Boulevard, Suite 1100Austin, TX 78701UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Machines for processing, handling, pressing, cooling or treating molten metal; machines for processing, handling, pressing, cooling or treating metal containing dross; dross presses; heads for dross presses; fume extraction, fume filtration and fume handling apparatus being parts of or processing by-products of dross presses; crushers being machines for industrial purposes, mills being machines for industrial purposes; sorting machines for chemical processing; filtering machines for chemical processing, cyclone separators and centrifuges; dissolving machines, leaching machines in the nature of separating machines for chemical processing; steam condensers being parts of machines; granulating machines for chemical processing, pelletizing machines for chemical processing, metal and powder shaping and moulding machines; parts and fittings for all the aforesaid goods; apparatus in the nature of valves, fans for machines, motors and engines, hydraulic presses for metalworking, molds for molten metal, pump impellers, water and liquid pumps for chemical processing machines, molds for pellets, machine parts, namely bearings and bushes, all being parts of machinesSECTION 8 - CANCELLED
011Chemical processing equipment in the nature of waste processing machines using heat and/or chemical breakdown processes, in the nature of fluid separation apparatus for separating gas from liquid in chemical processing; evaporators for chemical processing; heat exchangers for chemical processing; drying installations in the nature of drying apparatus for chemical processing; industrial apparatus using air or hot gases to assist in the drying of powders in chemical processing; drying installations in the nature of drying apparatus, namely, spray dryers, dryers using heated gases or air; burners, boilers and heaters for using in chemical processing; air filtering installation, gas filtering installations, water and liquid chemical filtering installations, filtering units for industrial dust collection systems; parts and fittings for all the aforesaid goodsSECTION 8 - CANCELLED
037Installation and maintenance of equipment and spares being parts of equipment for chemical processing plant; maintenance of buildings and plant being infrastructure for chemical processing plant; construction services, namely, for manufacture of buildings and of plant being infrastructure for chemical processing plant; constructing and maintaining chemical processing plant being buildings; construction, maintenance, decommissioning in the nature of cleaning, dismantling and demolition services, and repair of buildings, plant being infrastructure for chemical processing plant and equipment for chemical processingSECTION 8 - CANCELLED
040Rental services relating to apparatus and machines for processing, handling, pressing, cooling or treating molten metal, to apparatus and machines for processing, handling, pressing, cooling or treating metal containing dross, to dross presses, to heads for dross presses, to fume extraction, fume filtration and fume handling apparatus for dross presses, to crushers being machines, to mills being machines, to sorting machines for chemical processing, to filtering machines, separators and centrifuges, to dissolving machines and apparatus, to leaching machines and apparatus, to steam condensers, to granulating machines for chemical processing, to pelletizing machines for chemical processing, to shaping and moulding machines, to chemical processing equipment, to evaporators for chemical processing, to heat exchangers for chemical processing, to drying installations for chemical processing, to spray dryers, to dryers using heated gases or air, to burners, boilers and heaters for using in chemical processing, to structural parts and fittings for all the aforesaid goodsSECTION 8 - CANCELLED
042Designing chemical processing plant; engineering design services for buildings, plant, equipment and spares for chemical processing plant; installation services to commission, namely, testing operation and verifying operation of buildings, plant, equipment and spares for chemical processing plant to determine conformity with certification standardsSECTION 8 - CANCELLED
045Licensing services, namely, licensing of patents, trademarks, copyrights, unregistered design rights, registered designs, software, confidential information and intellectual property; licensing services, namely, licensing of know how in the nature of chemical processing methods, equipment, plants and buildingsSECTION 8 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 10, 2025C8..CANCELLED SEC. 8 (6-YR)
Mar 26, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Jul 14, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Jul 14, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Jul 14, 2020ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS
Jul 14, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 14, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jul 14, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED
Mar 26, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 8, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jan 8, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 19, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Nov 27, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Nov 27, 2018XAECEXAMINER'S AMENDMENT ENTERED
Nov 27, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Nov 27, 2018GNEAEXAMINERS AMENDMENT E-MAILED
Nov 27, 2018CNEAEXAMINERS AMENDMENT -WRITTEN
Oct 5, 2018GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Oct 5, 2018GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 5, 2018CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 20, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Aug 20, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 20, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 5, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Feb 22, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 22, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 22, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 14, 2018DOCKASSIGNED TO EXAMINER
Nov 14, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Nov 7, 2017NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance