Drawing for GREEN ANSWER

USPTO serial 87694079

GREEN ANSWER

Reviewed by CopyMark Law Group

Reg. 5830986Status 710
Filing date
Status date
Registration date
Aug 13, 2019
Examiner
PINO, BRIAN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with GREEN ANSWER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael J. Frodsham

MICHAEL J. FRODSHAM WORKMAN NYDEGGER60 E SOUTH TEMPLE STE 1000SALT LAKE CITY, UT 84111UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Solar photovoltaic power generation systems consisting of solar-powered electricity generators and automatic solar tracking sensors; solar power electricity generators; wind-powered electricity generators; wind-powered installations for generating electricity; fuel economisers for motors and engines, namely, fuel injectors; rotary brushes for machines; self-regulating fuel pumps for land vehicles; pneumatic transporters; cutting machines; civil engineering machinery, namely, bulldozers; chemical machines for industrial purposes, namely, blending machines for chemical processing; garbage waste disposals; textile machines, namely, textile tentering machines; compressors for refrigerators; power transmissions and gearings other than for land vehicles, namely, gears for machines; machines for cleaning surfaces using high-pressure water; DC electric generators; alternators; machines for manufacturing solar batterySECTION 8 - CANCELLED—
039Information and advisory services in relation to the distribution of energy, storage, distribution and supply of energy and fuel, distribution of electricity to households, distribution of energy for heating and cooling buildings, electricity distribution, and energy supplying; distribution of energy; storage and distribution of electricity; electricity supplying; providing information relating to the distribution of electricity, distribution and transmission of electricity, supply of electrical energy, gas, water and district heating; distribution of electrical energy, gas, water and district heatingSECTION 8 - CANCELLED—
040Consultancy in the field of energy generation; consultancy services relating to the generation of electrical energy; generation of electricity from solar energy; generation of electricity from wind energy; production of solar energy through photovoltaic power generation plants and equipment; rental of photovoltaic power generators; rental of photovoltaic power generation installations; generation of power; processing and transforming of energy; production and processing of fuels and of other sources of energy; production of energy; production of electrical energy from renewable sources; technical consultancy in the field of production of solar energy; generation of electricity from wave; wind and solar energy; electricity generating of wind power; rental of energy generating equipmentSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 27, 2026C8..CANCELLED SEC. 8 (6-YR)—
Aug 13, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Aug 13, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 28, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 28, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 8, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 22, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 22, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Apr 22, 2019GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 22, 2019GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 22, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 18, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 18, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 17, 2019ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Oct 1, 2018GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Oct 1, 2018GNSLLETTER OF SUSPENSION E-MAILED—
Oct 1, 2018CNSLSUSPENSION LETTER WRITTEN—
Sep 17, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 17, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 15, 2018ALIEASSIGNED TO LIE—
Sep 5, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 13, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 13, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 13, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 6, 2018DOCKASSIGNED TO EXAMINER—
Dec 4, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 24, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance