Drawing for FIAB RF THE DIFFERENCE MATTERS

USPTO serial 87732886

FIAB RF THE DIFFERENCE MATTERS

Reviewed by CopyMark Law Group

Reg. 6130735Status 702Renewal
Filing date
Status date
Registration date
Aug 18, 2020
Examiner
GOODSAID, IRA
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with FIAB RF THE DIFFERENCE MATTERS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,795*

Plus Government fees of $2,125

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Szymon Gurda

Szymon Gurda CHERSKOV FLAYNIK & GURDA, LLC903 COMMERCE DRSUITE 310OAK BROOK, IL 60523

Goods and services

ClassDescriptionStatusFirst use
007Electric and gas-operated welding machines; autogenous soldering machines; punching machines; automatic stamping machines; plywood gluing machines; electric glue guns; stitching machines; cutting machines; packaging machines; bookbinding machines for industrial purposes; rotary presses; metalworking machine tools; automatic industrial labeling machines for applying labels to containers and bottles; parts for the foregoing machines; electric current generators; welding electrodesACTIVEOct 2, 2017
009Optical cables, condensers, receivers and sensors; resistance and tool measuring instruments; digital signal processors; signal conditioning and communication devices for industrial process control; voltage regulators; film, sound and time recording apparatus; power controllers; electrical conductors; power and time switches; electric transformers; electric accumulators; electrical controlling devices; high-frequency switching power supplies; protective eyewear, helmets and masks; safety markers; batteries; alarm, optical, photoelectric, pressure, temperature, vibration and ultrasonic sensors; electric control panels; touchscreens; memory programming modules; computer peripheral devices; low pass inductor filter used in high power electrical applications; optical filtersACTIVESep 20, 2019
037installation, maintenance and repair of commercial and industrial machines, machine tools, presses, power generators, hand tools, motors and engines; installation, maintenance and repair of electronics, batteries, sensors, touchscreens, programming modules, computer peripheral devices, optical, measuring, signaling, regulating, recording, controlling and welding apparatus; riveting; building construction services; installation of prefabricated non-metal structures with flexible covers for agricultural, commercial or industrial storageACTIVEOct 2, 2017
040locksmithing, namely, custom fabrication of keys or locks; welding; treatment of materials in the nature of plastics and metals; chromium, nickel and tin plating; cutting of fabric, plastic, and metal; pipe tapping services, namely, drilling or cutting holes in pressurized pipes without draining or spilling the contents of the pipes; millworking; galvanizing; metal fabrication and finishing services for others; metal treatment; soldering; glass polishing; grinding; burnishing by abrasion; etching of plastic and metal; injection molding of plastic for others; staining services; treatment of materials by laser beam and plasma arc; custom manufacture of industrial machinesACTIVEDec 16, 2019
042Technical consultation in the field of power plant engineering, namely, testing and evaluation of power plant equipment to improve performance and efficiency of such equipment; design of construction equipment and machines; industrial design; measurement evaluations in the field of building construction, and preparing related reports; engineering; quality control for others of machinery and equipment; product testing; product research and development; technical consultancy in relation to technical research in the fields of construction and engineeringACTIVEOct 2, 2017

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 23, 2026NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Oct 23, 2026C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Oct 23, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 18, 2026E815TEAS SECTION 8 & 15 RECEIVED—
Aug 18, 2025REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Aug 18, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 15, 2020SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Jul 14, 2020CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Jul 10, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 10, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 8, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 8, 2020GSPSNOTIFICATION OF SU - PRIORITY ACTION E-MAILED—
Jan 8, 2020GSPRSU - PRIORITY ACTION E-MAILED—
Jan 8, 2020SPRASU - PRIORITY ACTION WRITTEN—
Jan 8, 2020SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jan 7, 2020AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Dec 26, 2019IUAFUSE AMENDMENT FILED—
Dec 26, 2019EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jul 16, 2019NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 21, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 21, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 1, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 16, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 16, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 16, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 9, 2019ALIEASSIGNED TO LIE—
Apr 5, 2019ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Oct 5, 2018GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Oct 5, 2018GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 5, 2018CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 4, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 4, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 4, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 4, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 4, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 4, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 3, 2018DOCKASSIGNED TO EXAMINER—
Jan 12, 2018MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jan 11, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 26, 2017NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance