Drawing for FDH INFRASTRUCTURE SERVICES

USPTO serial 87742424

FDH INFRASTRUCTURE SERVICES

Reviewed by CopyMark Law Group

Reg. 5604974Status 702Registered
Filing date
Status date
Registration date
Nov 13, 2018
Examiner
MAKHDOOM, SAIMA
Law office
FILE DESTROYED

What this means

Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with FDH INFRASTRUCTURE SERVICES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Emily Haas

Emily Haas Michael Best & Friedrich LLP4509 Creedmoor RoadSuite 501Raleigh, WI 27612

Goods and services

ClassDescriptionStatusFirst use
042Consulting services relating to the engineering of broadcast towers; consulting services relating to civil and site engineering, geotechnical engineering, structural engineering, engineering inspections, and radio frequency engineering; [ consulting services in the fields of forensic science; ] testing, analysis and evaluation of materials in the field of engineering and construction relating to assessment and control of subsurface anchor corrosion, unknown foundation investigations, subsurface void detections, concrete structural mapping, structural integrity and capacity analysis, anchor rod testing, trunnion pin friction testing, rapid bridge deck scanning, pipeline distributions, fatigue and vibration analysis, and failure investigations; consulting services in the field of engineering featuring nondestructive evaluation of critical structures; scientific research and development of electromagnetic and dispersive wave propagation techniques, primarily relating to nondestructive test methods applied to broadcast towers and their foundations, transmission towers, water tanks, bridges, dams, levees, and pipelinesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 1, 2026ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Mar 31, 2026ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Mar 31, 2026ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Mar 31, 2026ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jun 7, 2024NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jun 7, 2024C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jun 7, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 1, 2023E815TEAS SECTION 8 & 15 RECEIVED—
Nov 13, 2023REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Apr 30, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 30, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 30, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 30, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 30, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Nov 13, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 28, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 28, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 8, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 24, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 5, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 5, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 29, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 16, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 16, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 16, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 12, 2018DOCKASSIGNED TO EXAMINER—
Jan 27, 2018AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Jan 23, 2018ALIEASSIGNED TO LIE—
Jan 19, 2018MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jan 18, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 8, 2018PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Jan 6, 2018NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance