Drawing for EVERGREEN ENGINEERING

USPTO serial 87772517

EVERGREEN ENGINEERING

Reviewed by CopyMark Law Group

Reg. 5672725Status 702Registered
Filing date
Status date
Registration date
Feb 12, 2019
Examiner
KLEINMAN, CORINNE ANNE
Law office
Historical data usage

What this means

Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with EVERGREEN ENGINEERING?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Steve Zemanick

Steve Zemanick FOUR REASONS LEGAL, LLC8074 E 34th AveDenver, CO 80238United States

Goods and services

ClassDescriptionStatusFirst use
035Business consulting services in the fields of construction and engineering; Advisory services relating to business operations, namely, power plant management studies; Professional business consulting services in the fields of management, operation and maintenance of industrial facilities of others in the fields of chemical manufacturing, petroleum refining, building material manufacturing, consumer products manufacturing, metals manufacturing; Value engineering, namely, cost analysis; Economic feasibility studies; Management and business consulting services in the fields of transportation oil and gas, renewable energy, power, chemicals, biofuels, gasification, hazardous waste, wastewater treatment, air pollution control, manufacturing, energy facilities, building materials, metals, and mining; Business consulting in the field of environmental management, namely, advising businesses and individuals on issues of environmental impact, conservation, preservation and protection, and economic analysis for business purposesACTIVEApr 1, 1985
037Construction management; Industrial planning, namely, construction planning; Industrial planning, namely, the planning and laying out of production facilities; Maintenance of industrial facilities for others; Environmental management, namely, consultation services in the field of construction of environmentally-conscious buildings and facilities; Technical consulting services in the field of construction; Management of construction projectsACTIVEJan 6, 1986
042Engineering design services; Mechanical engineering; Civil engineering; Structural engineering; Electrical engineering; Environmental engineering and engineering services in the field of environmental compliance; Industrial planning services, namely, planning of buildings and industrial facilities and infrastructure systems for buildings and industrial facilities; Conducting feasibility studies in the field of industrial planning of buildings, industrial facilities and infrastructure systems for buildings and industrial facilities; Process engineering consultancy, namely, consulting services in the field of design and development of engineering processes; Process engineering consultancy, namely, process engineering consulting services in the field of the designing of machines, apparatus, instruments or systems composed of such machines, apparatus and instruments; Process engineering consultancy, namely, consulting in the field of the designing of workplace facilities and equipment to optimize efficiency and safety; Technical consulting services in the field of engineering services; Environmental management, namely, consulting services in the field of environmental assessment and planningACTIVEApr 1, 1985
045Environmental management, namely, advice and consultancy on environmental regulatory matters; Permitting, namely, obtaining environmental permits for development projects; Reviewing standards and practices to assure compliance with environmental laws and regulationsACTIVEDec 29, 1997

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 19, 2025NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Feb 19, 2025C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Feb 19, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 11, 2024E815TEAS SECTION 8 & 15 RECEIVED—
Feb 12, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Sep 19, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 19, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 12, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 3, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 27, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 27, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 7, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 25, 2018PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 21, 2018ALIEASSIGNED TO LIE—
Oct 10, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 20, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 19, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 19, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 18, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 18, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 18, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 9, 2018DOCKASSIGNED TO EXAMINER—
Feb 7, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 30, 2018NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance