USPTO serial 87783979
VCOSS S-ZERO
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- DIXON, JENNIFER HAZARD
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with VCOSS S-ZERO?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jill Anderfuren
Jill Anderfuren LEWIS BRISBOIS BISGAARD & SMITH LLP550 WEST ADAMS STREETSUITE 300CHICAGO, IL 60661Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; computers; computer hardware; computer software for design, development, programming, execution and maintenance of application programs; controller, safety controller and functional safety controller for computerized control systems, distributed control systems and instrumentation and control systems for safety and security critical processes, namely, chemical processing, metal processing, water treatment, manufacturing, medical systems, transportation systems, motor vehicles and rolling stock, and for power generation plants, nuclear plants, and power generation plants, namely, ABWR (advanced boiling water reactor) plants; parts and fittings for the aforesaid goods | ACTIVE | — |
| 037 | Building construction; installation, maintenance and repair of computer hardware; installation, maintenance and repair services for computerized control systems, distributed control systems, instrumentation and control systems, controllers, safety controllers and functional safety controllers; installation, maintenance and repair of safety and security systems for chemical plants, metal processing plants, water treatment plants, manufacturing plants, medical systems and transportation systems, motor vehicles and rolling stock, and for power generation plants, nuclear plants, and power generation plants, namely, ABWR (advanced boiling water reactor) plants; advisory and consultancy services related to the aforesaid services | ACTIVE | — |
| 042 | Design and development of computer hardware and software for design, development, programming, execution and maintenance of application programs; computer programming; installation, maintenance and repair of computer software; computer software and technology consultancy services; design and computer programming services for computerized control systems, distributed control systems, instrumentation and control systems, controllers, safety controllers and functional safety controllers; computer programming services for computerized control systems, distributed control systems, instrumentation and control systems, controllers, safety controllers and functional safety controllers, all for use in safety or security critical processes, namely, chemical processing, metal processing, water treatment, manufacturing, medical systems and transportation systems, motor vehicles and rolling stock, or for power generation plants, nuclear plants, and power generation plants, namely, ABWR (advanced boiling water reactor) plants; installation, maintenance and repair of computer software for use in computerized control systems, distributed control systems, instrumentation and control systems, controllers, safety controllers and functional safety controllers; installation, maintenance and repair of computer software for use in computerized control systems, distributed control systems, instrumentation and control systems, controllers, safety controllers and functional safety controllers for use in safety or security critical processes, namely, chemical processing, metal processing, water treatment plants, manufacturing, medical systems and transportation systems, motor vehicles and rolling stock and plants, namely, power generation plants, nuclear plants, and power generation plants, namely, ABWR (advanced boiling water reactor) plants | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Kabushiki Kaisha Hitachi Seisakusho
- Other trademarks owned by Kabushiki Kaisha Hitachi Seisakusho
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named VCOSS S-ZERO
- Prosecution event MAB6 explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 28, 2021 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Jun 28, 2021 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Oct 23, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 21, 2020 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Oct 21, 2020 | EXT3 | SOU EXTENSION 3 FILED | — |
| Oct 21, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 18, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 16, 2020 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Apr 16, 2020 | EXT2 | SOU EXTENSION 2 FILED | — |
| Apr 16, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Nov 13, 2019 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Nov 11, 2019 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Nov 11, 2019 | EXT1 | SOU EXTENSION 1 FILED | — |
| Nov 11, 2019 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| May 28, 2019 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Apr 2, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 2, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 13, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 21, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 5, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 5, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 5, 2019 | ALIE | ASSIGNED TO LIE | — |
| Feb 1, 2019 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Aug 3, 2018 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Aug 3, 2018 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 3, 2018 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 12, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 12, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 12, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 18, 2018 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 18, 2018 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 18, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 12, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 14, 2018 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Feb 13, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 8, 2018 | NWAP | NEW APPLICATION ENTERED | — |