USPTO serial 87811181
ELODRY
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 3, 2019
- Examiner
- MAHONEY, PAULA M
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with ELODRY?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Spruce Pine, NC, DE
Spruce Pine, NC, DE
Spruce Pine, NC, DE
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Cathy Moore
CATHY MOORE PROPAT LLC1794 DEER PARK LAKE ROADSPRUCE PINE, NC 28777UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines for generating energy, namely, electrical and electronic apparatus and equipment for use in generating energy obtained from sewage sludge; Steam-operated power generators using sewage sludge; Machines for generating energy of renewable products, namely, biogas applications to convert sewage sludge waste into energy, namely, blowing machines for the compression, exhaustion and transport of gases | SECTION 8 - CANCELLED | — |
| 011 | Steam generators using sewage sludge; Natural gas extracting and processing machines, namely, biogas fermentation reactors, namely, percolating fermenters and dry fermenters using sewage sludge; Biogas fermentation reactors, namely, percolating fermenters and dry fermenters used to generate thermal energy from sewage sludge from waste water clarifying installations being parts of waste purification installations; Bioreactor used to generate thermal energy from sewage sludge from waste purification installations; Alternative energy generation power plant installations using sewage sludge from waste purification for generating thermal energy, all being part of waste purification installations; Bioreactor for use in the treatment of sewage sludge waste being part of waste purification installations; Steam generating machines and installations generating energy using sewage sludge waste, all being part of waste purification installations; Heat generators used for producing thermal energy, in particular steam, through the processing of sewage sludge waste all being part of waste purification installations; Industrial sewage sludge waste treatment installations, namely, sewage sludge waste treatment septic tanks for the treatment of sewage of all kinds, all being part of waste purification installations; Machines used for the treatment of sewage sludge waste comprising sewage sludge waste comprising sewage sludge waste treatment tanks, septic tanks, clarification and thickening machines for use in treatment of liquids in the nature of sewage sludge waste, and filters for use in separating waste water and sewage sludge, all being part of waste purification installations; Heat generators, heat accumulators, heat exchangers and bioreactors for use in the treatment of sewage sludge waste, all being part of waste purification installations; Biogas fermenters for sewage sludge waste treatment, all being part of waste purification installations; Machines and installations for sewage sludge waste treatment, namely, thickening and dewatering machines for use in the treatment of sewage sludge waste; Thickening and dewatering machines for use in treatment of liquids, namely, sewage sludge waste of all kinds; Machines and installations for the thickening, dewatering and separation of sewage sludge waste; Machines and installations for waste disposal, in particular sewage sludge waste from waste purification, namely waste disposal incinerators | SECTION 8 - CANCELLED | — |
| 042 | Design of purification equipment and treatment plants for sewage; Development of purification equipment and treatment plants for sewage; Design of hydraulic equipment for the purification of sewage; Product development of hydraulic equipment for the purification of sewage; Planning of technical projects for others for the purification of sewage; Engineering services, namely, conducting of technical projects for the purification of sewage | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by ELIQUO STULZ
- Other trademarks owned by ELIQUO STULZ
- Other trademarks owned by ELIQUO STULZ
- Other trademarks in Class 007
- Other trademarks in Class 011
- Other trademarks in Class 042
- Similar marks named ELODRY
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 19, 2026 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Dec 3, 2024 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Dec 3, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 17, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 17, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 28, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 9, 2019 | ALIE | ASSIGNED TO LIE | — |
| Aug 1, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 10, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 10, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 10, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 17, 2019 | GPRN | NOTIFICATION OF PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jan 17, 2019 | GPRA | PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jan 17, 2019 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Dec 22, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 21, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 21, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 24, 2018 | GPRN | NOTIFICATION OF PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jun 24, 2018 | GPRA | PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jun 24, 2018 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jun 8, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 3, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 1, 2018 | NWAP | NEW APPLICATION ENTERED | — |