Drawing for DANG-IT

USPTO serial 87819860

DANG-IT

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
DINALLO, KEVIN M
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with DANG-IT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mark Terry

MARK TERRY MARK TERRY P.A801 BRICKELL AVE, SUITE 900MIAMI, FL 33131UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
001Fertilizers; Chemical fertilizers; Fertilizers for soil and potting soil; Mixed fertilizers; Fertilizers for domestic use; Plant fertilizerACTIVE—
006Brackets of metal for supporting plant growing equipment; Support bracket made of metal for attachment to support plant growing equipment; Hardware, namely, metal brackets for general use; Hardware mounting system comprised of metal brackets for plant growing equipment; Metal mounting brackets for general use; Metal brackets for use in the construction and assembly of plant growing equipment; Ducts of metal for ventilating; Metal ducts for ventilation systemsACTIVE—
008Hand-operated ratchet tools; Hand-operated ratchet tools for use with plant growing equipmentACTIVE—
011Air filters for HVAC systems; Air filters for ventilation systems; Air filters for plant growing ventilation systems; Air filtering installations; Air filters for industrial installations; LED (light emitting diode) lighting fixtures; LED lighting systems, namely, LED modules, power supplies, and wiring; Light Emitting Diode (LED) plant grow light; LED light fixtures for horticultural applications; LED lamps for growing plants; Electric exhaust fans; Electric ventilation fans; Ventilating fans for commercial use; Fans for ventilation systems; Electric fans; Ventilating fans for industrial purposes; Fans for HVAC systemsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
May 6, 2019MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
May 6, 2019ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Oct 2, 2018NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 7, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 7, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 18, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 3, 2018PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 2, 2018ALIEASSIGNED TO LIE—
Jun 19, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 19, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Jun 19, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 19, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 19, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 18, 2018DOCKASSIGNED TO EXAMINER—
Mar 10, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 8, 2018NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance