Drawing for GATE ENERGY

USPTO serial 87838133

GATE ENERGY

Reviewed by CopyMark Law Group

Reg. 5778740Status 702Registered
Filing date
Status date
Registration date
Jun 18, 2019
Examiner
CHHINA, KARANENDRA S
Law office
POST REGISTRATION

What this means

Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with GATE ENERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Margaret A Boulware

Margaret A Boulware Boulware & Valoir, PLLC2603 Augusta DrSuite 1350Houston, TX 77057

Goods and services

ClassDescriptionStatusFirst use
035Database management and consulting therefor; business management, namely, construction project integrity management; employment staffing servicesACTIVESep 1, 2016
037Construction project management services in the areas of onshore and offshore oil and gas projects, including flow assurance, startup procedures management, operating procedures management, operating guidelines management, topsides and subsea installation and project startup support, namely, total construction project management, mechanical field construction services, namely, controlled industrial bolting installation, pipeline field installation services, pipeline cleaning, vessel cleaning, specialty construction equipment rentals, glycol processing machine repair and maintenance, construction inspections of onshore and offshore subsea, subsurface and top side projects, electrical instrumentation maintenance servicesACTIVESep 1, 2016
040Machining, namely, cold cutting parts for others, field machining parts for others, industrial cutting of machine parts for others, spark free tooling of machine parts for others, pipeline field services, namely water filtration services, extended reach pipelines and lancing for othersACTIVESep 1, 2016
041Training in the field of all aspects of onshore, offshore and drilling completions and productionACTIVESep 1, 2016
042Engineering services in the areas of all aspects of onshore and offshore oil and gas drilling completions and production, flow assurance, chemical systems engineering, production chemistry engineering, materials selection and corrosion engineering, sub-surface engineering, flow computer modeling services, computer systems engineering, computer database systems monitoring support services, topsides and subsea installation and startup support, namely, engineering project management, pipeline field services, namely, hydrostatic pressure testing, nitrogen testing services, flow quality assurance, pipeline pigging, pipeline deposit mapping, well engineering and engineering consultingACTIVESep 1, 2016

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 3, 2026NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Sep 3, 2026C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Aug 27, 2026EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Aug 24, 2026PUMIPROOF OF USE INTERIM ACTION ISSUED—
Aug 19, 2026EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Mar 2, 2026PUMIPROOF OF USE INTERIM ACTION ISSUED—
Mar 2, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 3, 2025EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Jun 4, 2025PUM1OFFICE ACTION ISSUED POU1—
Jun 2, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 2, 2025E815TEAS SECTION 8 & 15 RECEIVED—
Jun 18, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Feb 14, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 14, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 14, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 18, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 2, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 2, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 13, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 22, 2019ALIEASSIGNED TO LIE—
Feb 7, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 7, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Feb 7, 2019GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 7, 2019GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 7, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 11, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 10, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 10, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 13, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 13, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 13, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 26, 2018DOCKASSIGNED TO EXAMINER—
Mar 23, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 20, 2018NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance