USPTO serial 87909674
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Chad Dougherty
Chad Dougherty Patterson & Sheridan, LLP24 Greenway PlazaSuite 1600Houston, TX 77046| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Transportable, modular and prefabricated buildings of metal; structures of metal, namely, modular, portable, prefabricated and floating structures of metal for the oil and gas industry, floating docks of metal, metal pontoons and structural supports therefor, buoyancy metal cans used to support decking and floating structures, anchors, metal storage tanks, general purpose metal storage containers, large steel plate structures for the storage, transportation and processing of liquids and gases, metal pillars for buildings, and metal reinforcement materials for building; framework of metal for building; prefabricated platforms of metal; floating docks of metal, for mooring boats; steel tubes and steel pipes; manifolds and termination assemblies, branching tubes, rigid and flexible flow lines, risers, and tie-in spools, all of metal for use with pipelines; steel molding plate; reinforcing materials of metal for pipes; metal storage tanks; metal fluid storage tanks; liquefied gas storage tanks of metal; metal tanks for storage featuring a floating roof; metal evaporation tanks for changing liquid into vapors; fittings of metal for building, namely, internal floating lids of metal for use with gas or liquefied gas storage tanks; building materials of metal; building panels of metal; steel plate; fittings of metal for building; mooring bollards of metal; prefabricated components of metal for building; clips of metal for cables and pipes; common metals, unwrought or semi-wrought; process equipment and internals for the exploration, production, refining, storage, transport, distribution and processing of natural resources, liquids, and gases, namely, metal pipes for liquid and gas transfer, metal pipe fittings, metal penstocks, pipes and conduits, containers of metal for liquid fuel, metal storage tanks, metal cylinders for compressed gas or liquids, sold empty, mesh wire with a multifilament component, expanded metal intertwined with a multifilament component, metal distillation columns, column packing for reactive distillation columns being catalytic metals or mixtures thereof for producing hydrocarbons and hydrocarbon based products, water settling tanks of metal | ACTIVE | — |
| 007 | Refining and petrochemical machinery and equipment, namely, industrial chemical reactors, reactor internals being parts for industrial chemical reactors, injectors being parts for industrial chemical reactors, industrial petrochemical refining reactors, industrial refining reactor components, namely, refining reactor vessels and refining reactor vessel subsystems, distillation and petrochemical plants machinery in the chemical, petrochemical, petroleum and oil industries, refineries being petrochemical refining machinery, apparatus and installations for the distillation and refining of petroleum being oil, natural gas and petrochemical refining machinery, apparatus and installations for the production of petroleum and petroleum coke for residual fuel oil being petroleum production machinery, apparatus and installations for the distillation, treatment and refining of chemical and petrochemical products, chemical, biochemical, and petroleum refining reactor components, namely, reactor internals, all for industrial use and being separating and refining machinery for chemical processing, heat exchangers being parts of machinery, gas condensers being parts of machines, steam generators being parts of machines, distillation column being separating machinery for chemical processing, steam ejector machinery, coking units being petrochemical refining machinery, machine coupling, except for land vehicles, and all parts for all of the aforesaid goods; machines for oil development and refinement; machinery and equipment for oil development and refinement, namely, oil-well pumping machinery for use in oil injection and gas compression operations, all for use in the petroleum production industry; separating machines for chemical processes, and offshore pipe-handling machinery in the nature of machinery for handling tubular pipe on the deck of an offshore vessel | ACTIVE | — |
| 035 | Business services, namely, procuring qualified personnel, equipment and materials on behalf of others and business management services in the field of construction, installation and repair of containers, tanks, industrial storage and processing spheres, terminals, towers and tanks, storage vessels and pressure vessels, sea platforms, offshore platforms, power units, refinery units, LNG processing units, petrochemical units, industrial units, pipelines, drainage systems, dredging systems, mooring systems; business services, namely, procuring qualified personnel, equipment and materials on behalf of others and business management services in the field of equipment for petroleum, petrochemical and natural gas, production, storage, transport and distribution, instrumentation, measuring equipment systems, illuminating units and dredging; procurement of repair and replacement components used in the above items | ACTIVE | — |
| 037 | Construction, installation and repair services of vessels, namely, containers, industrial storage and processing spheres, terminals, towers and tanks, storage vessels and pressure vessels, sea platforms, offshore platforms, tanks, power plants, refinery units, LNG processing units, petrochemical units, industrial units, pipelines, drainage systems, dredging systems, mooring systems, construction, installation and repair of equipment for the production, processing, storage, transport and distribution of petroleum products, petrochemicals and natural gas, instrumentation and measuring equipment systems, illuminating units and any of the units constructed or installed above; repair of metallic components used in the above construction, installation and repair services | ACTIVE | — |
| 040 | Custom fabrication of metallic components used in vessels, namely, containers, tanks, industrial storage and processing spheres, terminals, towers and tanks, storage vessels and pressure vessels, sea platforms, off shore platforms, power plants, industrial units, pipelines, drainage systems, dredging systems, mooring systems, petroleum and gas production, petroleum production and processing, instrumentation and measuring equipment systems, and illuminating units; custom fabrication of equipment for the production, processing, storage, transport and distribution of petroleum products, petrochemicals and natural gas, instrumentation and measuring equipment systems, illuminating units and any of the aforementioned units constructed or installed; custom fabrication of metallic components used in the above fabrication, construction, installation and repair services of equipment for the production, processing, storage, transport and distribution of petroleum products, petrochemicals and natural gas, instrumentation and measuring equipment systems, illuminating units | ACTIVE | — |
| 042 | Design, engineering, inspection and testing services for others in the fields of vessels, namely, containers, industrial storage and processing spheres, terminals, towers and tanks, storage vessels and pressure vessels, sea platforms, offshore platforms, platforms for sulfur production, tanks, power plants, refinery units, LNG processing plants and units, petrochemical plants and units, industrial plants, pipelines, drainage systems, dredging systems, mooring systems, oil and gas production systems, petroleum processing facilities, instrumentation systems, lighting systems | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 8, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 8, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 8, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 8, 2025 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jan 8, 2025 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Aug 16, 2022 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Aug 16, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 9, 2022 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jul 8, 2022 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jun 29, 2022 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jun 16, 2022 | IUAF | USE AMENDMENT FILED | — |
| Jun 16, 2022 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Feb 12, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 11, 2022 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Feb 11, 2022 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Feb 4, 2022 | EXT5 | SOU EXTENSION 5 FILED | — |
| Feb 4, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 30, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 28, 2021 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Jul 28, 2021 | EXT4 | SOU EXTENSION 4 FILED | — |
| Jul 28, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 5, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 3, 2021 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Feb 3, 2021 | EXT3 | SOU EXTENSION 3 FILED | — |
| Feb 3, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 22, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 20, 2020 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jul 20, 2020 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jul 20, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 6, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 4, 2020 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Feb 4, 2020 | EXT1 | SOU EXTENSION 1 FILED | — |
| Feb 4, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 6, 2019 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 11, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 11, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 22, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 6, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 1, 2019 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 1, 2019 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 1, 2019 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 1, 2019 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 10, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 10, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 10, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 11, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 11, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 11, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 7, 2019 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Dec 4, 2018 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Nov 16, 2018 | ALIE | ASSIGNED TO LIE | — |
| Nov 2, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 2, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 2, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 2, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 2, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 4, 2018 | GPRN | NOTIFICATION OF PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jun 4, 2018 | GPRA | PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jun 4, 2018 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| May 21, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| May 17, 2018 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| May 16, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 10, 2018 | NWAP | NEW APPLICATION ENTERED | — |