Drawing for N NITRO CONSTRUCTION SERVICES

USPTO serial 87938940

N NITRO CONSTRUCTION SERVICES

Reviewed by CopyMark Law Group

Reg. 6236137Status 702Renewal
Filing date
Status date
Registration date
Jan 5, 2021
Examiner
MICHOS, JOHN E
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with N NITRO CONSTRUCTION SERVICES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,795*

Plus Government fees of $1,625

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey L. Costellia

Jeffrey L. Costellia NIXON PEABODY LLP799 9TH STREET, NW, SUITE 500WASHINGTON, DC 20001United States

Goods and services

ClassDescriptionStatusFirst use
037Building Construction Services; Electrical contractor services; Mechanical Contractor Services; HVAC/R contractor services; Pipe erection services; Construction services, namely, maintenance and installation of building construction machines and equipment; millwright services, namely, installation and repair of scaffolding and building construction equipment and machines; installation and maintenance of systems for building security, safety, and electricity; Machinery retrofit and conversion services; Installation and maintenance of building automation systems; consulting services in the field of construction of electrical systems and power monitoring stations; Installation and maintenance of Uninterruptible Power Systems for buildings; installation and maintenance of wireless access control systems for buildings; building construction services, namely, retrofitting of fire sprinkler systems; installation, repair and maintenance of fire sprinkler systems, fire alarm systems, fire extinguishers, fire hydrants, fire pumps, standpipe systems, backflow prevention systems, and foam systems; laying pipe for accessing underground and above ground water sources; installation and maintenance of Power over Ethernet devices and systems in connection with construction projects; installation and maintenance of computer hardware systems for building automation, building security, HVAC, fire and smoke detection, prevention, and extinguishing, building access and building access controls, IOT (internet of things) as related to networks for buildings and construction projects, and closed circuit televisionACTIVEMar 1, 2018
039Underground and above ground water supply servicesACTIVEMar 1, 2018
040Custom fabrication of pipes and custom fabrication of fire sprinkler systemsACTIVEMar 1, 2018
042Mechanical engineering services; architectural design services for commercial and industrial buildings; Consulting services in the field of building automation; Testing of Fiber optic and ethernet network infrastructure cabling performance and quality and for determining conformity with certification standards; monitoring electrical systems for electrical disturbances and power quality, and logging results; ARC flash testing to determine the heat transfer response through a material, fabric, or fabric system when exposed to the thermal energy from an electric arc for use in the building and construction industry; calculation of hydraulic pressure for fire sprinkler systems; design, inspection, and testing of fire sprinkler systems, fire alarm systems, fire extinguishers, fire hydrants, fire pumps, standpipe systems, backflow prevention systems, and foam systems; design of fire sprinkler systems, fire alarm systemsACTIVEMar 1, 2018
045Fire alarm and building security alarm monitoringACTIVEMar 1, 2018

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 13, 2026NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED—
Sep 23, 2026NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Sep 23, 2026C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Sep 23, 2026A7OKAMENDMENT UNDER SECTION 7 - PROCESSED—
Aug 19, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 18, 2026ES7RTEAS SECTION 7 REQUEST RECEIVED—
May 18, 2026E815TEAS SECTION 8 & 15 RECEIVED—
Jan 5, 2026REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jan 5, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 20, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 20, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 30, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 14, 2020PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 3, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 3, 2020XAECEXAMINER'S AMENDMENT ENTERED—
Sep 3, 2020GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 3, 2020GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 3, 2020CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 2, 2020ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Aug 25, 2020PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Aug 13, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 11, 2020XAECEXAMINER'S AMENDMENT ENTERED—
Aug 7, 2020GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 7, 2020GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 7, 2020CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 3, 2020GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jun 3, 2020GNSLLETTER OF SUSPENSION E-MAILED—
Jun 3, 2020CNSLSUSPENSION LETTER WRITTEN—
May 12, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 12, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 7, 2020ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Apr 22, 2020RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Oct 22, 2019RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Oct 17, 2019ALIEASSIGNED TO LIE—
Apr 1, 2019GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Apr 1, 2019GNSLLETTER OF SUSPENSION E-MAILED—
Apr 1, 2019CNSLSUSPENSION LETTER WRITTEN—
Mar 15, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 14, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 14, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 20, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 20, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 20, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 18, 2018DOCKASSIGNED TO EXAMINER—
Jun 5, 2018MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jun 4, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 1, 2018NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance