Drawing for SUSTINEO SUSTAINABILITY SIMPLIFIED

USPTO serial 87939386

SUSTINEO SUSTAINABILITY SIMPLIFIED

Reviewed by CopyMark Law Group

Reg. 5669195Status 710
Filing date
Status date
Registration date
Feb 5, 2019
Examiner
BLANDU, FLORENTINA
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with SUSTINEO SUSTAINABILITY SIMPLIFIED?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Vatche Chorbajian

VATCHE CHORBAJIAN LAW OFFICES OF VATCHE CHORBAJIAN, APC6006 EL TORDO RD.207RANCHO SANTA FE, CA 92067

Goods and services

ClassDescriptionStatusFirst use
037Construction of Green and Sustainable buildings; Consulting services in the field of construction of wind energy facilities; Electrical contracting; Installation and maintenance of photovoltaic installations; Installation and maintenance of solar energy based power plants; Installation of solar energy systems and alternative energy products for residential and commercial use; Mechanical contractor servicesSECTION 8 - CANCELLEDJul 2, 2015
042Drafting and development of photovoltaic systems; Engineering services in the field of reducing carbon dioxide emissions; Engineering services in the field of energy efficiency, energy production, renewable energy, and alternative sources of energy; Quality evaluation for others in the field of maintenance, repair and installation of solar installations and photovoltaic installations; Conducting scientific feasibility studiesSECTION 8 - CANCELLEDJul 2, 2015

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 15, 2025C8..CANCELLED SEC. 8 (6-YR)—
Feb 5, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Feb 5, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 2, 2019ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Nov 20, 2018ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Oct 23, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 23, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 3, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 17, 2018RTTPRESTORE TO TEAS PLUS—
Sep 16, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 25, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 24, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 24, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 30, 2018CEPECOMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED—
Jul 30, 2018ALIEASSIGNED TO LIE—
Jul 27, 2018GEANNOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Jul 27, 2018GEAPEXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Jul 27, 2018CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED—
Jul 27, 2018RFTPREMOVED FROM TEAS PLUS—
Jul 26, 2018DOCKASSIGNED TO EXAMINER—
Jun 5, 2018MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jun 4, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 1, 2018NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance