Drawing for ECO CHANGES

USPTO serial 87956892

ECO CHANGES

Reviewed by CopyMark Law Group

Reg. 5755020Status 710
Filing date
Status date
Registration date
May 21, 2019
Examiner
SHANAHAN, PATRICK
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ECO CHANGES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Perla M. Kuhn

PERLA M. KUHN FOX ROTHSCHILD LLP997 LENOX DRIVE, BUILDING 3,PRINCETON PIKE CORPORATE CENTERLAWRENCEVILLE, NJ 08648-2311

Goods and services

ClassDescriptionStatusFirst use
007Elevators; escalators; compressors for machines; waste compacting machines; waste shredding machines; industrial waste disposals; starters for motors and engines; current generators, alternators; electric motors other than for land vehiclesSECTION 8 - CANCELLED—
009Electric control panels; electric distribution consoles; electric distribution boards; electric current transformers; inverters; electric converters; electrical transducers; electromagnetic contactors; condensers; voltage regulators; circuit breakers; voltage stabilizers; voltage surge protectors; synchronous phase modifier; uninterruptible power supplies; electric installations for the remote control of industrial operations; solar photovoltaic power generation systems comprised of solar photovoltaic modules, current-collecting junction boxes, current transformers, electric distribution boards and wattmeters; solar batteries; electronic indicator boards; ammeters; voltmeters; wattmeters; telecommunication apparatus, namely, data signal controllers, data transmitters and laser diodes, all for optical telecommunication; network terminators; electrical network channel terminating equipment; computerized numerical controllers for factory automation; integrated circuits (IC), large scale integrated circuits (LSI); computer systems comprised of computers, computer programs, electronic databases, interface unit and telecommunication networks for monitoring and control apparatus for plant facilities, monitoring and collection of energy consumption data of plant facilities and monitoring and management of energy demand of factories; computers; computer programs for controlling industrial machines, land vehicles, electrical power installations, and, air conditioning, anticrime or disaster-preventing equipment of buildings or facilities; automated security gates; monitoring and controlling apparatus for security gates, namely, cameras, LCD monitors and storage devices of personal ID, all for security purposes; switches and controllers for lighting apparatus and installationsSECTION 8 - CANCELLED—
011Lighting apparatus, namely, lighting fixtures and lighting installations; electric lamps; LEDs for lighting; water heaters; air-conditioning, air cooling and ventilation apparatus and instruments; air conditioners; heating installations; chillers for air conditioning; air purifiers; humidifiers; dehumidifiers; electric fans; remote control apparatus for air conditioning installations; heat pumps; refrigerating display cabinets; electric hand driers for rest room; electric rice cookers; electric toasters; microwave ovens; induction heating ranges, refrigeratorsSECTION 8 - CANCELLED—
012Electric motors for railcars; electric motors for electric power steering systems of automobilesSECTION 8 - CANCELLED—
036Management of buildingsSECTION 8 - CANCELLED—
040Sorting of waste and recyclable material; destruction of waste and trash; incineration of waste and trash; recycling of waste and trashSECTION 8 - CANCELLED—
042Remote monitoring services of heating, ventilating and air conditioning apparatus; remote monitoring services of electric power supplySECTION 8 - CANCELLED—
045Remote monitoring of security systems of buildings and facilitiesSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 5, 2025C8..CANCELLED SEC. 8 (6-YR)—
May 21, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
May 21, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 5, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 5, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 13, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 30, 2019FIXDELECTRONIC RECORD REVIEW COMPLETE—
Jan 25, 2019ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Jan 18, 2019ALIEASSIGNED TO LIE—
Jan 2, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 29, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 28, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 28, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 28, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 11, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 11, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 11, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 10, 2018DOCKASSIGNED TO EXAMINER—
Jun 16, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 14, 2018NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance